5.Follow step 5 of installation
Ⅰ
(page 8) to
complete the connection of power wires and
control lead wires.
6.Main body fixed.
Push the main body upward into the ceilling,
use 4 of the ST4.2X30 self-tapping screws
provided in the accessory package to fix it.
7.Follow step 7,8,9,10 of installation
(Fig.25 & Fig.26 )
Ⅰ
(page 9-
10) to complete the install plate fixed,install
plate locked,louve fixed and paste the switch
labels.
INSTALLATION
Ⅱ
(JOIST MOUNTING)
11
Fig.25
Joist
Fig.26
OPERATING INSTRUCTIONS
1.Fan heater is in STOP stage when switch is set
as shown in Fig.27.The unit is not operated
in this stage.
2.Fan heater is in HEAT mode when switch is set
as ahown in Fig.28.The unit blown out hot air.
The bathroom become warm.
3.Fan heater is in VENT mode when switch is set
as shown in Fig.29.
Fresh air is caming into bathroom.
On
Heat
Off
Vent
On
Heat
Off
Vent
On
Heat
Off
Vent
Fig.27
Fig.28
Fig.29
The
heater
shall
be
properly
installed
before
it
is
used
.
WARNING
1.Never use petrol, benzene, thinner or any other
such chemicals for cleaning the ventilating fan.
2.Do not allow any water to get into the motor.
3.Do not soak resin parts in water over 60°C(140°F).
CAUTION:
MAINTENANCE (CLEANING)
Disconnect power source before working on unit.
Routine maintenance must be done every year.
WARNING:
Before cleaning, make sure the power has been
turned off at the circuit breaker panel and that the
heating element of the heater is cool.
Fig.30
①
Pull out the filter mesh assembly as shown
in the figure (Fig.30).