3 Power ON and OFF, and
Items to Check
3.1 Safety Circuit Design ..........................................................................3-2
3.2 Before Turning On the Power .............................................................3-3
3.3 Procedure for Turning On the Power ..................................................3-4
3.4 Confirming while the Power is ON ......................................................3-5
3.4.1 Items to check after turning on the power........................................ 3-5
3.4.2 Checking the Installation of the External Safety Circuit ................... 3-6
3.4.3 Checking the Safety Circuit Based on the Unit ................................ 3-6
3.4.4 Checking the Operation of the Near Home Switch and Home
3.4.5 Checking Rotating and Moving Directions and Moving Distance .... 3-7
WUME-FPXHPOSG-01
3-1
Summary of Contents for FP-XH Series
Page 2: ... MEMO 2 WUME FPXHPOSG 01 ...
Page 18: ... MEMO 1 10 WUME FPXHPOSG 01 ...
Page 30: ... MEMO 3 8 WUME FPXHPOSG 01 ...
Page 51: ...4 4 Reading Elapsed Values WUME FPXHPOSG 01 4 21 ...
Page 52: ... MEMO 4 22 WUME FPXHPOSG 01 ...
Page 88: ... MEMO 5 36 WUME FPXHPOSG 01 ...
Page 94: ... MEMO 6 6 WUME FPXHPOSG 01 ...
Page 140: ... MEMO 9 8 WUME FPXHPOSG 01 ...
Page 193: ... MEMO WUME FPXHPOSG 01 ...
Page 194: ...Panasonic Industrial Devices SUNX Co Ltd 2020 October 2020 WUME FPXHPOSG 01 ...