8
Pemeriksaan Selepas Pemasangan /
Check Point After Installation /
Tandakan
/ Check /
ġ
1. Suis Tuil menekan Suis
/ Switch Lever press the Switch. /
2. Bolt Elips, Sesendal P-R, Sesendal Pegas dan Nat Heksagon diketatkan dengan kuat dan Cemat Baji dimasukkan
dan dibengkokkan atas sebab keselamatan.
/ The Ellipse Bolt, P-R Washer, Spring Washer and Hexa Nut are fi rmly
tightened and the Cotter Pin is inserted and bent for safety reason. /
ġ
3. Skru Wayar Keselamatan diketatkan dengan kuat.
/ Safety Wire Screw is fi rmly tightened. /
4. Semua dawai disambungkan oleh kakitangan komponen.
/ All wires are connected correctly by competent personnel. /
Ȅ
Neutral (Biru)
/
Neutral (Blue)
/
Hidup (Coklat)
/
Live (Brown)
/
Bumi (Hijau/Kuning)
/
Earth (Green/Yellow)
/
ġ
AMARAN
/ WARNING /
Pastikan semua Terminal disambung dengan betul oleh
kakitangan yang kompeten untuk mengelakkan bahaya
elektrik.
Boleh menyebabkan kebakaran, kejutan elektrik, Kipas
Siling jatuh dan kecederaan.
Make sure all the Terminals are connected correctly by
competent personnel to avoid electrical hazards.
Can cause fi re, electrical shock, Ceiling Fan drops and injuries.
4
Sambungkan Kord Kuasa kepada terminal 3 Pin.
Connect the Power Cord to the 3 Pin Terminal.
3
Memasang Bilah Kipas Pada Unit Motor / Install Blade To Motor Unit /
B)
1
Tanggalkan Skru Bilah (6 keping, berwarna perak) dari Pemasangan Motor.
Langkah 1: Pasangkan Bilah ke arah Cangkuk Penutup seperti yang ditunjukkan dalam rajah langkah 1.
Langkah 2: Tarik Bilah mengikut arah dalam rajah langkah 2 untuk mengunci Bilah.
Langkah 3: Jajarkan wayar Keselamatan dengan lubang skru Bilah kemudian ketatkan Bilah dengan Skru Bilah (Berwarna perak).
Setiap Bilah menggunakan 2 batang Skru. (Kilas penge
WDWDQXQWXNUXMXNDQ1FP
Remove Blade Screw (6 pieces, silver colour) from Motor Assembly.
Step 1 : Assemble Blade towards to the Cover Hook as shown in fi gure step 1.
Step 2 : Pull the Blade according to direction in fi gure step 2 to lock the Blade.
Step 3 : Align the Safety wire with Blade screw hole and tighten the Blades fi rmly with Blade Screw (Silver colour).
Each Blade use 2 piece of Screws. (Tightening torque for reference : 250-300N
cm)
1FP
Skru Bilah (6 keping, berwarna perak)
Blade Screw (6 pieces, silver color)
6
Cangkuk Penutup
/
Cover Hook /
Lubang Bilah
/
Blade Hole /
Langkah 1
/ Step 1 /
1
Langkah 2
/ Step 2 /
2
Langkah 3
/ Step 3 /
3
Kord Kuasa
/
Power cord /
3 Pin Terminal
/
3 Pin Terminal /
Biru (Neutral)
/
Blue (Neutral) /
Coklat (Hidup)
/
Brown (Live) /
Hijau/Kuning (Bumi)
/
Green/Yellow (Earth) /
Hijau/Kuning (Bumi)
/
Green/Yellow (Earth) /
Coklat (Hidup)
/
Brown (Live) /
Biru (Neutral)
/
Blue (Neutral) /
Lubang Skru Bilah
/
Blade Screw Hole /
Dawai
Keselamatan
/
Safety Wire /
Pita Wayar Keselamatan
/
Safety Wire Tape /
Jajarkan wayar keselamatan
dengan lubang skru bilah
/
Safety wire align with blade
screw hole /
s
Ketatkan Wayar Keselamatan dengan
Skru Bilah.
/
s
Tighten Safety Wire with Blade Screw /
s
s
Pastikan Pita Wayar Keselamatan
dilekatkan bersama wayar Keselamatan.
/
s
Ensure Safety Wire Tape is sticked with
Safety wire. /
s
Pastikan semua Terminal disambung dengan betul oleh
kakitangan yang kompeten untuk mengelakkan bahaya
elektrik.
Boleh menyebabkan kebakaran, kejutan elektrik, Kipas
Siling jatuh dan kecederaan.
Make sure all the Terminals are connected correctly by
competent personnel to avoid electrical hazards.
Can cause fi re, electrical shock, Ceiling Fan drops and injuries.
AMARAN
/ WARNING /
⌴ᅁ