
11
Ref. No. 2G
Procedure 2A
→
2B
→
2C
→
2D
→
2E
→
2F
→
2G
Removal or attachment of Gear box block.
(Removal)
1. Turn the thrust plate to remove.
2. The internal parts of gear box block can be removed one after
another.
(Attachment)
1. Assemble the parts in reverse order as shown in the figure.
NOTE:
Carriers, Ring gears and Clutch plate have their own correct
directions for proper reassembly.
Summary of Contents for EY7442
Page 3: ...3 3 Troubleshooting Guide Refer to Wiring Connection Diagram ...
Page 4: ...4 ...
Page 5: ...5 ...
Page 6: ...6 ...
Page 15: ...15 Ref No 2J 2 Procedure 2A 2B 2C 2D 2E 2F 2G 2H 2I 2J Assembly of Driving block for EY7950 ...
Page 16: ...16 5 Wiring Connection Diagram ...
Page 17: ...17 6 Schematic Diagram 6 1 EY7442 6 2 EY7450 6 3 EY7950 ...
Page 18: ...Model No EY7442 Exploded View for EY7442 7 Exploded View and Replacement Parts List ...
Page 20: ...Model No EY7450 Exploded View for EY7450 ...