11
Ref. No. 2F
Procedure 1A
→
2A
→
2B
→
2C
→
2D
→
2E
→
2F Disassembly of gear box block.
1. The internal parts of gear box block can be disassembled in order.
Ref. No. 2G
Procedure 1A
→
2A
→
2B
→
2C
→
2D
→
2E
→
2F
→
2G
ssembly of the Adjusting Screw.
1. Hold the gear box block with the small projection on top, and align
the largest projection of adjusting screw.
NOTE:
Make sure that the adjusting screw has its own correct direction for
proper assembly. Failure to do so, the clutch handle does not
rotate properly.
2. Turn the adjusting screw into the driving block until the end of spring
comes the same line as the largest projection of adjusting screw for
clockwise direction.
Summary of Contents for EY7420
Page 3: ...3 3 Troubleshooting Guide Refer to Wiring Connection Diagram ...
Page 4: ...4 ...
Page 5: ...5 ...
Page 12: ...12 Ref No 2H Procedure 1A 2A 2B 2C 2D 2E 2F 2G 2H Check point on wiring ...
Page 13: ...13 Ref No 2I Procedure 1A 2A 2B 2C 2D 2E 2F 2G 2H 2I Check point on assembly ...
Page 14: ...14 5 Wiring Connection Diagram 6 Schematic Diagram ...
Page 15: ...Model No EY7420 Exploded View 7Exploded View and Replacement Parts List 15 ...