8. Pull the shaft and the rubber out.
<Assembling the optical pickup unit>
1. Pass the intermediate FPC through the frame hole.
2. Align the guide section of the optical pickup unit with the
rail.
3. Install the shaft top to the holder.
4. The intermediate FFC is fixed as shown below.
8.7. Traverse Motor
1. Unscrew the screws.
2. Remove the cover while lifting the inner gear.
20
DVD-S42PC / DVD-S422PC
Summary of Contents for DVD-S42PC
Page 21: ...3 Remove the solders 4 Remove the traverse motor 21 DVD S42PC DVD S422PC ...
Page 26: ...26 DVD S42PC DVD S422PC ...
Page 27: ...27 DVD S42PC DVD S422PC ...
Page 38: ...DVD S42PC DVD S422PC 38 ...
Page 44: ...DVD S42PC DVD S422PC 44 ...
Page 58: ...DVD S42PC DVD S422PC 58 ...
Page 59: ...18 EXPLODED VIEWS 18 1 CASING PARTS MECHANISM SECTION EXPLODED VIEW 59 DVD S42PC DVD S422PC ...
Page 60: ...18 2 MECHANISM SECTION EXPLODED VIEW 60 DVD S42PC DVD S422PC ...
Page 61: ...18 3 PACKING ACCESSORIES SECTION EXPLODED VIEW 61 DVD S42PC DVD S422PC ...