5. Make sure that the tray and the drive arm move
smoothly.
8.4. Loading section
1. Spread the tabs at the both sides and push out the drive
arm shaft.
2. Hook the lock lever spring on the lock lever projection part
temporarily.
3. Unlock the tab and remove the lock lever.
4. Remove the belt.
5. Unlock the tab and remove the pulley.
6. Remove the relay gear.
7. Turn the change lever in the arrow direction till it stops.
8. Hook the change lever spring on the change lever project
part temporarily.
16
DVD-S325E / DVD-S325EG
Summary of Contents for DVD-S325E
Page 25: ...25 DVD S325E DVD S325EG ...
Page 26: ...26 DVD S325E DVD S325EG ...
Page 34: ...DVD S325E DVD S325EG 34 ...
Page 38: ...14 4 VIDEO BLOCK DIAGRAM DVD S325E DVD S325EG 38 ...
Page 54: ...DVD S325E DVD S325EG 54 ...
Page 55: ...18 EXPLODED VIEWS 18 1 CASING PARTS MECHANISM SECTION EXPLODED VIEW 55 DVD S325E DVD S325EG ...
Page 56: ...18 2 MECHANISM SECTION EXPLODED VIEW 56 DVD S325E DVD S325EG ...
Page 57: ...18 3 PACKING ACCESSORIES SECTION EXPLODED VIEW 57 DVD S325E DVD S325EG ...