11.1. SERVICE POSITIONS
11 MEASUREMENTS AND ADJUSTMENTS
Note:
For description of the disassembling procedure, see the section ASSEMBLING AND DISASSEMBLING
(DISASSEMBLY FLOW CHART).
11.1.1. CHECKING AND REPAIRING OF POWER P.C.B.
1. Top Case
·
Remove 2 Screws (A) on side
·
Remove 3 rear Screws (B) on rear
·
Remove Top Case
2. Power P.C.B.
·
Remove 1 Screw for AC Inlet fixing
·
Remove 3 Screws fixing Power P.C.B.
·
Remove 1 Connector to Main P.C.B.
·
Remove 1 Connector to Fan P.C.B.
·
Lift up Power P.C.B. sideways out of the Guide Pins.
·
Connect Extension Cable:
−
between Main P.C.B. and Power P.C.B. with RFKZ0216
−
between Fan Motor and Power P.C.B. with RFKZ0168
·
Put Power P.C.B. on Insulation Board so that it’s solder side faces top
Caution 1
Red wire in the extension cable should be connected to pin 1
Caution 2
Orginal screws should be used
37
DMR-EX75EG / DMR-EX75EC / DMR-EX75EB / DMR-EX85EG / DMR-EX85EB
Summary of Contents for DMR-EX85EC
Page 3: ...1 EXPLODED VIEW 1 1 CASING PARTS 3 DMR EX85EC ...
Page 50: ...46 DMR EX75EG DMR EX75EC DMR EX75EB DMR EX85EG DMR EX85EB ...
Page 74: ...DMR EX75EG DMR EX75EC DMR EX75EB DMR EX85EG DMR EX85EB 70 ...
Page 81: ...16 2 PACKING ACCESSORIES SECTION 77 DMR EX75EG DMR EX75EC DMR EX75EB DMR EX85EG DMR EX85EB ...