
41
15. Servicing
Mode
OFF ON
OFF ON
Fig. 1
SW1 (PUMP DOWN)
SW2 (OPERATION
TEST)
JP1 (COOL
ONLY)
SW3 (WIRING CHECK)
SW4 (POWER
SAVE)
SW5 (MODE
PRIORITY)
15.1 Pump down operation (SW1)
Operate the pump down process according to the following procedure
o
Confirm the valve on the liquid side and gas side are open.
o
Press PUMP DOWN switch (SW1) on the Display PCB inside the outdoor unit for more than 5 seconds.
Pump down (cooling) operation is performed for 15 minutes.
o
Set the liquid side 3 way valve to close position and wait until the pressure gauge indicates 0.01MPa
(0.1kg/cm
2
G).
o
Immediate set the gas side valve to close position and then press the PUMP DOWN switch (SW1) to stop the
pump down operation.
NOTE: Pump down operation will stop automatically after 15 minutes if PUMP DOWN switch (SW1) is not pressed
again. Pump down operation is not started within 3 minutes after compressor is stopped.
LED 2 3 4 5 Message
Status
Pump down operation in progress
3 minutes before operation end
2 minutes before operation end
1 minute before operation end
Pump down operation end
: Blinking
close
Hexagonal
wrench
Liquid shut-off valve
Gas shut-off valve
Valve lid
15.2 Test Run Operation
Test operation can be carried out using TEST OPERATION switch (SW2) on the Display PCB inside the outdoor
unit.
For Cooling test, press the TEST OPERATION switch (SW2) for 5 seconds or more but less than 10 seconds,
LED1 and LED 2 will illuminate when shift into cooling test operation.
For Heating test, press the TEST OPERATION switch (SW2) for more than 10 seconds, LED 1 and LED 3 will
illuminate when shift into heating test operation.
Press the TEST OPERATION switch (SW2) again to cancel test operation.