Gas side piping ( ) 3/8"
Liquid side piping (
) 1/4"
Additional drain hose ( )
To carry out the drainage
test, remove the air filters
and pour water into the heat
exchanger.
Vinyl tape (Wide) ( )
Apply after carrying out a
drainage test.
Bend the pipe as closely on
the wall as possible, but be
careful that it doesn t break.
Putty (Gum type sealer) ( )
Bushing Sleeve ( )
Sleeve ( )
Installation plate
1
Installation parts you
should purchase ( )
Saddle ( )
10
cm
or
more
(Left and right are identical)
Insulation of piping connections
Carry out insulation
after checking for
gas leaks and
secure with vinyl
tape.
Vinyl tape
100
cm
or more
30
cm
or more
10 cm
or more
5c
m
or
more
5 cm
or more
36
PA7DKD,PA9DKD
Type designation 245 IEC 57
or heavier cord
Connecting cable ( )
(5-CORE WIRE/1.5 mm
2
+2CORE WIRE/0.50mm
2
PC7DKD,PC9DKD
(3-CORE WIRE/1.5 mm
2
)-
)-
This illustration is for explanation purposes only.
The indoor unit will actually face a different way.
CS-PA7DKD / CU-PA7DKD / CS-PC7DKD / CU-PC7DKD
Fig 1