background image

26 

11.3 Outdoor 

Unit 

11.3.1 

Install the Outdoor Unit 

š

  After selecting the best location, start installation according to indoor/outdoor unit installation diagram. 

1  Fix the unit on concrete or rigid frame firmly and horizontally by bolt nut (ø13/32"). 
2  When installing at roof, please consider strong wind and earthquake. 

Please fasten the installation stand firmly with bolt or nails. 

Model

A B C D

E9NKUA, E12NKUA

22-7/16" 

4-1/8"

23/32" 

12-19/32"

11.3.2 

Connect the Piping 

11.3.2.1  Connecting the piping to 

indoor 

Please make flare after inserting flare nut (locate at 
joint portion, of tube assembly) onto the copper pipe. 
(In case of using long piping) 

Connect the piping 

š

  Align the center of piping and sufficiently tighten 

the flare nut with fingers. 

š

  Further tighten the flare nut with torque wrench in 

specified torque as stated in the table. 

11.3.2.2  Connecting the piping to 

outdoor 

Decide piping length and then cut by using pipe cutter. 
Remove burrs from cut edge. 
Make flare after inserting the flare nut (locate at valve) 
onto the copper pipe. 
Align center of piping to valves and then tighten with 
torque wrench to the specified torque as stated in the 
table. 

Do not over tighten, over tightening may cause gas leakage. 

Piping size 

Torque 

1/4"

13.3 Ibf.ft

3/8”

31.0 Ibf.ft

1/2"

40.6 Ibf.ft

5/8”

47.9 Ibf.ft

3/4"

73.8 Ibf.ft

Summary of Contents for CS-E12NKUAW

Page 1: ...eakage during the installation or repairing of refrigerant circuit WARNING This service information is designed for experienced repair technicians only and is not designed for use by the general public It does not contain warnings or cautions to advise non technical individuals of potential dangers in attempting to service a product Products powered by electricity should be serviced or repaired on...

Page 2: ...st 8 2 ft 11 1 2 Outdoor Unit If an awning is built over the unit to prevent direct sunlight or rain be careful that heat radiation from the condenser is not obstructed There should not be any animal or plant which could be affected by hot air discharged Keep the spaces indicated by arrows from wall ceiling fence or other obstacles Do not place any obstacles which may cause a short circuit of the ...

Page 3: ... using anchor bolts o Always mount the installation plate horizontally by aligning the marking off line with the thread and using a level gauge 2 Drill the piping plate hole with ø2 3 4 hole core drill o Line according to the left and right side of the installation plate The meeting point of the extended line is the center of the hole Another method is by putting measuring tape at position as show...

Page 4: ...23 11 2 3 Indoor Unit Installation 11 2 3 1 For the right rear piping 11 2 3 2 For the right bottom piping 11 2 3 3 For the embedded piping This can be used for left rear piping and bottom piping also ...

Page 5: ...ainst chassis 3 Connection cable between indoor unit and outdoor unit should be UL listed or CSA approved 4 conductor wires minimum AWG16 in accordance with local electric codes o Ensure the colour of wires of outdoor unit and terminal number are the same as the indoor s repectively o Earth lead wire shall be Yellow Green Y G in colour and shall be longer than other lead wires as shown in the figu...

Page 6: ...iping 1 Please cut using pipe cutter and then remove the burrs 2 Remove the burrs by using reamer If burrs are not removed gas leakage may be caused Turn the piping end down to avoid the metal powder entering the pipe 3 Please make flare after inserting the flare nut onto the copper pipes ...

Page 7: ...te at joint portion of tube assembly onto the copper pipe In case of using long piping Connect the piping Align the center of piping and sufficiently tighten the flare nut with fingers Further tighten the flare nut with torque wrench in specified torque as stated in the table 11 3 2 2 Connecting the piping to outdoor Decide piping length and then cut by using pipe cutter Remove burrs from cut edge...

Page 8: ...IDE THE INDOOR UNIT AND PIPES in the following procedures 1 Connect a charging hose with a push pin to the Low side of a charging set and the service port of the 3 way valve 2 Connect the micron gauge between vacuum pump and service port of outdoor units 3 Turn on the power switch of the vacuum pump and make sure that connect digital micron gauge and to pull down to a value of 500 microns 4 To mak...

Page 9: ...he power supply cord and connection cable between indoor unit and outdoor unit according to the diagram below 9 Secure the wire onto the control board with the holder clamper 10 After completing wiring connections reattach the control board cover Metal and Resin and the top panel to the original position with the screws 11 For wire stripping and connection requirement refer to instruction 11 2 4 o...

Reviews: