3. Location keys in the remarks column indicates the general location of
the parts shown in the exploded drawing, as in a road map.
4. The marking (RTL) indicates that Retention Time is limited for this item.
After the discontinuation of assembly in production, the item will
continue to be available for a specific period of time. The retention
period of availability is dependent on the type of assembly, and in
accordance with the laws governing part and product retention. After
the end of this period, the assembly will no longer be available.
- Order intake period is basically six months after the first shipment.
30
Summary of Contents for CQ-C1312NW
Page 5: ...5 ...
Page 13: ...IC201 YESAM293 IC271 C1EA00000041 13 ...
Page 14: ...IC401 C1BB00001045 IC501 YESAM283 IC681 YESAM273 14 ...
Page 15: ...IC750 YESAM267 10 2 CD Servo Block IC402 YESAM353 15 ...
Page 16: ...IC403 YESAM171 IC405 YESAM270 16 ...
Page 35: ...15 WIRING DIAGRAM 15 1 Main Block Top View 15 2 Main Block Bottom View 15 3 Display Block 35 ...
Page 37: ...17 BLOCK DIAGRAM 17 1 Main Block 37 ...
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 47: ...7210 05 11 CQ C1312NW DISPLAY C0HBA0000195 5V 5V 5V 26 ...