background image

18

Apply roof panel 

P520

 and triangle panels 

P521

&

P522

. Connect

plastic strips 

P334

.

See illustrations A to D at step 

#17

.

P333

P521

P522

P520

P334

P334

19

18

Assembly follows illustration.

QTY

QTY

P316

P316

P316

P520

1

#P316

1

#P520

2

#P333

2

#P334

QTY

1

#P521

1

#P522

QTY

Summary of Contents for 700492

Page 1: ...a site choose a sunny level position away from overhanging trees If you are fixing your greenhouse directly to a solid concrete foundation use the pre drilled holes in the metal base supplied The com...

Page 2: ...771 1180mm 46 46 2 A751 585mm 23 03 1 A754 610mm24 02 2 M745 RIGTH M746 LEFT M747 1 2 4 2 2 2 M8x16mm 0 63 2 1 1 1 1 3 1 P501 P502 P520 P519 1 P521 P522 1 1 1 3 4 2 30 30 8 4 2 M6x10mm 0 39 M6x10mm 0...

Page 3: ...745 746 A B 447 747 C 412 412 A761 1 Assembly of base profiles Be sure to bend the profiles into 90 and to tighten firmly with screws 447 QTY 1 A761 QTY QTY 1 M747 1 M745 1 M746...

Page 4: ...mbly of profile A761 NOTE All nuts 412 should be on the inside of the stretcher insert the screws 411 from the outside inwards DO NOT FASTERN THE SCREWS AND NUTS until you complete your greenhouse ass...

Page 5: ...to use the lower hall of existing two Assembly of the gutter A731 The profile also includes the door track Be sure to locate the gutter as shown in the illustration A253 A754 411 412 A754 5 4 QTY 2 A...

Page 6: ...he illustration Assembly of the A741 profiles Connect the profile on both ends to profiles A715 and A716 and mark the connecting points to the wall using the pre drilled halls in the profile A716 A715...

Page 7: ...of Connect the proile to profiles A741 on one side and A731 on the second side Assembly of profile A701 on the front wall Connect the profile to the profile A731 on one sideand to profile A761 on the...

Page 8: ...tender appropriate lubrication material Connect profiles A771 with profiles A791 using screws 421 411 Door sub assembly continued Lay panel P502 Be sure to insert both ends into the channel in profile...

Page 9: ...ips Onto the aluminum profiles in it s assigned position See illustrations A to D Door sub assembly Continued Connect all four plastic rollers P304 using screws 421 and nuts 422 A B C C D A B C D P332...

Page 10: ...panels Slid the door unto the track on frofile A731 gutter and on the same time on proffile A761 Insert two screws 411 nuts 412 on both ends of profile A731 Assembly noise reduction profile P317 to wa...

Page 11: ...stic strips P331and P330 See illustations A to D Lay panel P501 Be sure to insert upper and into the channel in profile A731 and frofiles A754 P501 P501 P501 P331 P330 17 16 QTY QTY 3 P501 2 P330 4 P3...

Page 12: ...iangle panels P521 P522 Connect plastic strips P334 See illustrations A to D at step 17 P333 P521 P522 P520 P334 P334 19 18 Assembly follows illustration QTY QTY P316 P316 P316 P520 1 P316 1 P520 2 P3...

Page 13: ...11 411 411 A752 A307 P519 P302 412 422 Vent sub assembly Apply profiles A782 A751 A752 and assemble according to the illustration using screws and nuts 411 412 Assembly follows illustration 21 20 QTY...

Page 14: ...Fasten all screws and nuts of your Lean To greenhouse M307 23 22 QTY 2 M307...

Reviews: