6
BOM ID
Description
Qty
1
M10x60mm Stay Bolt
10
2
Gasket
1
3
Side Gasket
2
4
Integrated Gutter Profile
1
5
M6x40 stay Bolt
2
3. PACKAGING
3.1. Preliminary Checks
On receipt of the packed goods and before starting their assembly, check the integrity of the
material and the presence of all the components necessary for the installation.
In case of anomalies, immediately stop the work and contact with hospital.
Fixing elements such as screws, plugs etc. are included in the box.
If not please contact service department of Palmiye.
Do not use a knife to avoid the risk of ruining the paint or other materials.
3.2. Packed Parts
3.2.1. Integrated Gutter
5
Summary of Contents for Skyroof Prestige
Page 1: ...1 Installation Manual Skyroof Prestige...
Page 15: ...15 4 1 4 Cross Check and Level Control...
Page 31: ...31 Place corner plastic between perimeter lighting profile on the corner side...
Page 34: ...34...
Page 49: ...49...
Page 50: ...50 www palmiye eu...