background image

•Fall Protection •Training •Netting •PPE

®

INSTRUCTION MANUAL

CABLE HORIZONTAL LIFELINE SYSTEM

These Instructions Apply to the Following Model(s):

A60160 (60’), A100160 (100’)

Summary of Contents for A60160

Page 1: ...Fall Protection Training Netting PPE INSTRUCTION MANUAL CABLE HORIZONTAL LIFELINE SYSTEM These Instructions Apply to the Following Model s A60160 60 A100160 100...

Page 2: ...stem Cable HLL This manual must be read and understood in its entirety whereas any specified training course on fall protection can be utilized to provide the necessary knowledge All of these instruct...

Page 3: ...t PFAS applications will hold up to two people at a time when used with the appropriate supporting structure The supporting structure must also withstand loads applied in the advised directions of at...

Page 4: ...e HLL Systems there must be enough space between the hook and its attachment point This is known as rolling out and can cause the gate on the hook to inadvertently open and release All cables must be...

Page 5: ...nchor Distance From Leading Edge Y Working Distance Along Roof Edge Either Direction X Working Angle From Perpendicular 6 8 53 10 9 9 45 15 11 7 38 20 13 3 33 25 14 6 30 30 16 28 35 17 2 26 40 18 3 24...

Page 6: ...SafetyUS com Fall Protection Training Netting PPE Safe Attachment Zone DANGER ZONES Work in this areas NOT allowed Horizontal Lifeline 100 120 60 Horizontal Lifeline Place HLL 6 10 Back from Leading E...

Page 7: ...Competent Person that anchor points are rated for 5 000 lbs 2 Measure distance between anchor points Set the clamps to measured distance 3 Make sure turnbuckle is all the way extended 4 Attach carabi...

Page 8: ...Protection Maintenance Cleaning and Storage If Cable HLL System fails inspection in any way immediately remove it from service and contact Palmer Safety to inquire about its return or repair Cleaning...

Page 9: ...nite as long as it passes pre use and Competent Person inspections User must inspect prior to EACH use Competent Person other than user must complete formal inspection at least every 6 months Competen...

Page 10: ...PERFORMED Approved by Approved by Approved by Approved by Approved by Approved by Approved by Safety Information WARNING Failure to understand and comply with safety regulations may result in serious...

Page 11: ...11 General Work Products LLC 6000 Jefferson Hwy Harahan LA 70123 www PalmerSafetyUS com Fall Protection Training Netting PPE Notes...

Page 12: ...Manual Revision 230301 General Work Products LLC 6000 Jefferson Hwy Harahan LA 70123 504 733 1808 www PalmerSafetyUS com Fall Protection Training Netting PPE...

Reviews: