background image

Installation manual 

 

 
 

 

Base frame 

(Foundation joists) 

The base frame of the house must be completely flat and level to ensure that the installation proceeds 
without problems. 

ATTENTION: different house can have different foundation placements –  see the appended 
base frame drawing (in Technical specifications)! 

Place the impregnated foundation joists on the prepared foundation in accordance with the drawing at 
equal intervals. Make sure that the joists are level and rectangular prior to screwing them together.  

ADVICE

: It is recommended to place between the foundation joists  and foundation a damp-proof 

course that will protect the house from moisture and decay.  

ADVICE

: To ensure protection from wind and storm, it is recommended to attach the foundation joists 

to the foundation (for this, you can use for instance metal angles, anchors, etc.). The corresponding 
materials are not included in the supplied kit! 

Installation of foundation joists: 

 

 

Walls 

When installing the walls, it is important to remember that: 

  The logs are always assembled with their tongue upwards! 

  If necessary, use the hitting block and hammer! Never directly hit the tongue with the hammer! 

Install the walls in accordance with the appended wall plans (see Technical specifications). 

First of all place half  logs of front and back wall at the 
correct location and attach them with screws to the 
foundation  joists. Then install the side wall logs. Make sure 
that  the first layer of logs  extends a bit over the foundation 
joists: the logs must extend over the joists by some 3-5 mm. 
You will thus protect the house from moisture, allowing the 
free flow of rainwater into the ground.  

 

ATTENTION

After the first layer of logs, measure the 

diagonal lengths and, if necessary, re-install the logs. Only if 
the diagonal lengths are completely equal is the base frame 
rectangular and you can mutually attach the logs.  

         

 

            

 

The first layer of logs: 

 

Continue  the installation of the walls by strongly forcing the wall logs into one another. If necessary, 
use the hitting block and hammer. At the same time, do not forget to begin the installation of the door 
and windows. You should definitely begin the door installation after the 5

th

-6

th

 layer of logs. 

www.simplylogcabins.co.uk

Summary of Contents for Whitewood Malta 3

Page 1: ...es sont exclues Si une r clamation avait lieu veuillez respecter le d roulement suivant Il vous faudra pr senter votre commer ant sp cialis ce bulletin de contr le avec le r c piss de l achat Ce ne se...

Page 2: ...u r c piss Data prova d acquisto Fecha recibo Kvitteringsdato Kasse bons dato Forwarder Pick up Others Door Verzending Zelf afhalen Spedition Selbstabholer Par Transporteur Propres moyens Tramite Sped...

Page 3: ...produktet Alle rechten en technische wijzigingen voorbehouden Installation manual Montageanleitung Notice de montage Istruzioni per il montaggio Manual de montaje Monteringsanvisning Installatiegids L...

Page 4: ...y review complaints if you submit the control number of the house to the seller Peculiarities of wood as a natural material The warranty does not cover Wooden details already painted processed with a...

Page 5: ...pregnation agent and do that namely both inside and outside Otherwise the doors and windows can become twisted After the house assembly is completed we recommend for the conclusive finishing a weather...

Page 6: ...sure that there are sufficient air apertures under the house floor for ventilation We recommend the following foundation options Strip or spot foundation Foundation from concrete or pavement slabs Cas...

Page 7: ...ways assembled with their tongue upwards If necessary use the hitting block and hammer Never directly hit the tongue with the hammer Install the walls in accordance with the appended wall plans see Te...

Page 8: ...eight The wall plans see Technical specifications show how many logs go under the window Install the window similarly with the door Just like the door push the window frame with the window into the wi...

Page 9: ...dewall log somewhat lower Roof Before installing the roof boards make sure that the house is completely level Use the water level to check all walls ATTENTION When placing the roof use a stable ladder...

Page 10: ...ons do not include it in the kit Floor Only when the house is built completely you can install the floor boards thus avoiding unnecessary smudging on the floor Place the floor boards on the base frame...

Page 11: ...ts so the wall logs can settle Installation of storm braces General advice Problem Gaps appear between the wall logs Cause Additional details are attached to the house that do not allow wood to swell...

Page 12: ...w w w s i m p l y l o g c a b i n s c o u k...

Page 13: ...w w w s i m p l y l o g c a b i n s c o u k...

Page 14: ...w w w s i m p l y l o g c a b i n s c o u k...

Page 15: ...w w w s i m p l y l o g c a b i n s c o u k...

Page 16: ...w w w s i m p l y l o g c a b i n s c o u k...

Page 17: ...w w w s i m p l y l o g c a b i n s c o u k...

Page 18: ...w w w s i m p l y l o g c a b i n s c o u k...

Page 19: ...w w w s i m p l y l o g c a b i n s c o u k...

Page 20: ...w w w s i m p l y l o g c a b i n s c o u k...

Page 21: ...w w w s i m p l y l o g c a b i n s c o u k...

Reviews: