background image

Installation manual 

 

 
 

 

this case, the floor boards should not be attached very densely to avoid likely bulging. Leave some 
space (1-2 mm) between the floor boards to allow for swelling. But if your climate is warm and dry, you 
can install the boards densely because they will become drier and spaces may appear between them.  

 

Storm braces 

(NB! Not included in some house option kits!) 

Attach the storm braces (if included in 
the supplied kit) to the inner sides of 
the front (2 units) and back (2 units) 
walls with the supplied bolts. It is 
important for the logs to be drilled 
through in advance. Please keep the 
distances indicated in the drawing so 
that no problems occur due to wood 
swelling or diminishing.  

ADVICE

: Make sure that the storm 

braces are attached to the apex log 
from above and to the middle of the 
first full-length wall log from below. If 
necessary, shorten the upper ends of 
the slats.  

Do not turn the screws tightly so wood 
can further swell or diminish.  

With the house having settled, you 
should adjust the attachments so the 
wall logs can settle.  

 

Installation of storm braces: 

 

 

General advice: 

Problem:  

Gaps appear between the wall logs  

Cause:    

Additional details are attached to the house that do not allow wood to    

  swell/diminish. 
Solutions:  

If the door/window is attached to the wall logs with screws/nails, remove these 
screws/nails; 

If the storm brace is screwed on too tightly, loosen its attachment;  
If (rain water) pipes are installed on the wall, loosen their attachments;  

  

Problem:  

The doors and windows become stuck. 

Cause:    

The house/foundation has settled. 

Solution: 

Check whether the house is level. Level the foundation joists and walls. 

Cause: 

The doors and windows have swelled due to moisture.  

Solution:  

Adjust the door and window hinges; if necessary, plane the door or window narrower. 

 

 

 

 

 

 

 
We wish you total success with the garden house installation and much 
joy with this house for many years to come!

 

Summary of Contents for FRB28-3226-2

Page 1: ...dications ult rieures sont exclues Si une r clamation avait lieu veuillez respecter le d roulement suivant Il vous faudra pr senter votre commer ant sp cialis ce bulletin de contr le avec le r c piss...

Page 2: ...Aankoopbewijs Datum Kaufbeleg Datum Date du r c piss Data prova d acquisto Fecha recibo Kvitteringsdato Kasse bons dato Forwarder Pick up Others Door Verzending Zelf afhalen Spedition Selbstabholer Pa...

Page 3: ...e tekniske egenskaper ved produktet Alle rechten en technische wijzigingen voorbehouden Installation manual Montageanleitung Notice de montage Istruzioni per il montaggio Manual de montaje Monteringsa...

Page 4: ...f the house We can only review complaints if you submit the control number of the house to the seller The warranty does not cover Peculiarities of wood as a natural material Wooden details already pai...

Page 5: ...windows with a wood impregnation agent and do that namely both inside and outside Otherwise the doors and windows can become twisted After the house assembly is completed we recommend for the conclusi...

Page 6: ...At the same time make sure that there are sufficient air apertures under the house floor for ventilation We recommend the following foundation options Strip or spot foundation Foundation from concrete...

Page 7: ...rresponding materials are not included in the supplied kit Installation of foundation joists Walls When installing the walls it is important to remember that The logs are always assembled with their t...

Page 8: ...eaves on the hinges now To open and close the door fit the separately packaged lock and handle Window installation Continue with the installation of the wall logs until you reach the window height The...

Page 9: ...r plane the apex or sidewall log somewhat lower Roof Before installing the roof boards make sure that the house is completely level Use the water level to check all walls ATTENTION When placing the ro...

Page 10: ...with the supplied felt nails at intervals of about 15 cm Make sure that the felt strips overlap by at least 10 cm Having installed the roof cover material attach the wind braces to the roof and the fa...

Page 11: ...ry shorten the upper ends of the slats Do not turn the screws tightly so wood can further swell or diminish With the house having settled you should adjust the attachments so the wall logs can settle...

Page 12: ......

Page 13: ......

Page 14: ......

Page 15: ......

Page 16: ......

Page 17: ......

Page 18: ......

Page 19: ......

Page 20: ......

Reviews: