Installation manual 

Base frame 

(Foundation joists) 

The base frame of the house must be completely flat and level to ensure that the installation proceeds 
without problems. 

ATTENTION: different house can have different foundation placements – see the appended 
base frame drawing (in Technical specifications)! 

Place the impregnated foundation joists on the prepared foundation in accordance with the drawing at 
equal intervals. Make sure that the joists are level and rectangular prior to screwing them together.  

ADVICE

: It is recommended to place between the foundation joists and foundation a damp-proof 

course that will protect the house from moisture and decay.  

ADVICE

: To ensure protection from wind and storm, it is recommended to attach the foundation joists 

to the foundation (for this, you can use for instance metal angles, anchors, etc.). The corresponding 
materials are not included in the supplied kit! 

Installation of foundation joists: 

Walls 

When installing the walls, it is important to remember that: 

¾

The logs are always assembled with their tongue upwards!

¾

If necessary, use the hitting block and hammer! Never directly hit the tongue with the hammer!

Install the walls in accordance with the appended wall plans (see Technical specifications). 

First of all place half logs of front and back wall at the 
correct location and attach them with screws to the 
foundation joists. Then install the side wall logs. Make sure 
that the first layer of logs extends a bit over the foundation 
joists: the logs must extend over the joists by some 3-5 mm. 
You will thus protect the house from moisture, allowing the 
free flow of rainwater into the ground.  

ATTENTION

After the first layer of logs, measure the 

diagonal lengths and, if necessary, re-install the logs. Only if 
the diagonal lengths are completely equal is the base frame 
rectangular and you can mutually attach the logs.  

 The first layer of logs: 

Continue the installation of the walls by strongly forcing the wall logs into one another. If necessary, 
use the hitting block and hammer. At the same time, do not forget to begin the installation of the door 
and windows. You should definitely begin the door installation after the 5

th

-6

th

 layer of logs. 

www.simplylogcabins.co.uk

Summary of Contents for 514715

Page 1: ...ues de tout échange Toutes les revendications ultérieures sont exclues Si une réclamation avait lieu veuillez respecter le déroulement suivant Il vous faudra présenter à votre commerçant spécialisé ce bulletin de contrôle avec le récépissé de l achat Ce ne sera que moyennant présentation de ces documents qu un traitement rapide et sans problème de votre réclamation sera possible Italiano La casett...

Page 2: ...__________________________________________________ På dansk Kontrol Certifikat Opbevares sikkert Dansk Det købte hus er fremstillet i overensstemmelse med de høje kvalitets krav Produktet er blevet omhyggeligt inspiceret og pakket For at undgå eventuelle problemer i løbet af monteringen udført af dig selv eller håndværker af dit eget valg anbefaler vi at du undersøger leverancen for fuldstændighed...

Page 3: ...chten en technische wijzigingen voorbehouden Installation manual Montageanleitung Notice de montage Istruzioni per il montaggio Manual de montaje Monteringsanvisning Installatiegids Log cabin FRJ70 4738 1 514715 Blockhaus Maisonnette en poutres Casa di travi Casa de jardin Anneks Tuinhuis Width 470 x Depth 380 cm Breite Tiefe Largeur Profondeur Lunghezza Profondita Ancho Profundidad Bredde Dybde B...

Page 4: ...ly review complaints if you submit the control number of the house to the seller The warranty does not cover Peculiarities of wood as a natural material Wooden details already painted processed with a wood preservative Wooden details containing whole branches that do not endanger the stability of the house Colour tone variations caused by wood structure differences that do not influence wood lifet...

Page 5: ...mpregnation agent and do that namely both inside and outside Otherwise the doors and windows can become twisted After the house assembly is completed we recommend for the conclusive finishing a weather protection paint that will protect wood from moisture and UV radiation When painting use high quality tools and paints follow the paint application manual and manufacturer s safety and usage instruc...

Page 6: ... sure that there are sufficient air apertures under the house floor for ventilation We recommend the following foundation options Strip or spot foundation Foundation from concrete or pavement slabs Cast concrete bed Prepare the foundation so that the foundation joists are propped up on every side with intervals not exceeding 50 60 cm Consult an expert in this field or have the foundation prepared ...

Page 7: ...always assembled with their tongue upwards If necessary use the hitting block and hammer Never directly hit the tongue with the hammer Install the walls in accordance with the appended wall plans see Technical specifications First of all place half logs of front and back wall at the correct location and attach them with screws to the foundation joists Then install the side wall logs Make sure that...

Page 8: ...ou reach the window height The wall plans see Technical specifications show how many logs go under the window Install the window similarly with the door Just like the door push the window frame with the window into the window aperture onto the lower log applying force Make sure that the window is not fitted backwards topsy turvy ADVICE Definitely make sure that the windows and doors open in the pr...

Page 9: ...idewall log somewhat lower Roof Before installing the roof boards make sure that the house is completely level Use the water level to check all walls ATTENTION When placing the roof use a stable ladder Do not step on the roof as the structure is suitable to sustain only an even load snow wind etc and not a point load Begin the installation of the roof boards from the front edge of the roof Tap the...

Page 10: ...t the felt strips overlap by at least 10 cm Having installed the roof cover material attach the wind braces to the roof and the facia boards to the rafters and upper wall logs Installation of wind braces and facia boards Floor Only when the house is built completely can you install the floor boards thus avoiding unnecessary smudging on the floor Place the floor boards on the base frame tap them li...

Page 11: ...so wood can further swell or diminish With the house having settled you should adjust the attachments so the wall logs can settle Installation of storm braces General advice Problem Gaps appear between the wall logs Cause Additional details are attached to the house that do not allow wood to swell diminish Solutions If the door window is attached to the wall logs with screws nails remove these scr...

Page 12: ...w w w s i m p l y l o g c a b i n s c o u k ...

Page 13: ...w w w s i m p l y l o g c a b i n s c o u k ...

Page 14: ...w w w s i m p l y l o g c a b i n s c o u k ...

Page 15: ...w w w s i m p l y l o g c a b i n s c o u k ...

Page 16: ...w w w s i m p l y l o g c a b i n s c o u k ...

Page 17: ...w w w s i m p l y l o g c a b i n s c o u k ...

Page 18: ...w w w s i m p l y l o g c a b i n s c o u k ...

Page 19: ...w w w s i m p l y l o g c a b i n s c o u k ...

Page 20: ...w w w s i m p l y l o g c a b i n s c o u k ...

Page 21: ...w w w s i m p l y l o g c a b i n s c o u k ...

Reviews: