220 mm
ENGLISH
6 Commissioning
After positioning the appliance it is necessary to perform the following operations:
1. Open the door.
2.
Make sure that the flue inspection valve is in the closed position with the rod positioned in the
appropriate bracket
(Fig. 6.1a)
.
3.
Insert in sequence the spacer, deflectors and O
2
RING as shown in the diagram
(Fig. 6.1b - Fig. 6.1c
- Fig. 6.1d)
.
Product images are purely indicative
Fig. 6.1a
Fig. 6.1d
Fig. 6.1b
Fig. 6.1c
33
004778150 - 18/08/2020