8
Hardware Installation
The Pakedge SW8-GBP can be installed on a flat surface, or
mounted in an audio/video rack.
Before installing the SW8-GBP, we recommend that:
1.
The switch should be placed with a minimum of 25mm space
around the unit for proper ventilation.
2.
The switch must be away from environments with excessive
moisture.
Desktop
Installation
1.
Install the switch on a level surface that can support the weight
of the device and the relevant components.
2.
Plug the female end of the provided power cord into the switch
and plug the male end into a power outlet.
Rack-mount
Installation
Rack-mounting is the best way for the Pakedge SW8-GBP to be
installed when combined with a series of networking devices.
Procedures to rack-mount the SW8-GBP:
1.
Disconnect all cables and place the switch on a flat surface.
2.
Fasten mounting brackets onto both sides of the unit. Tighten
with a screwdriver.
3.
Insert the unit into the rack and secure with suitable screws.
4.
Reconnect all cables.
Installing Network Cables
1.
Crossover or straight-through cable: All ports on the switch
support Auto-MDI/MDI-X functionality. Both straight-through
or crossover cables can be used to connect the switch with PCs
and other devices such as switches, hubs, or routers.
2.
Category 3, 4, 5, 5e, or 6 UTP/STP cable: To make a solid
connection and obtain optimal performance, an appropriate
Summary of Contents for SW8-GBP
Page 15: ...12 Notes...