PG-Flex System Overview
12
Metallic Bypass Pair
As shown in Figure 8, a third pair may be used between the remote terminal and central office
terminal to provide a metallic test path from the central office test equipment to a selected
subscriber drop.
Figure 8. Metallic Test Access Through COT Channel Unit
When testing subscriber drops through the metallic bypass pair, the length and quality of the bypass
pair must be taken into consideration when analyzing the measurement results.
Only one subscriber circuit in a PG-Flex shelf can be accessed at a time when an FPI-729 List 1 or
an FAU-728 List 2 is installed.
If an FAU-728 List 1 is installed, one subscriber circuit in each PG-Flex system can be accessed
simultaneously.
Summary of Contents for PG-Flex
Page 10: ...PG Flex System Overview 2 Figure 1 Typical PG Flex Configuration 23 Shelf shown ...
Page 24: ...PG Flex System Overview 16 ...
Page 52: ...Installing PG Flex System Hardware 44 Figure 21 Connecting the Metallic Bypass Pair ...
Page 62: ...Installing PG Flex System Hardware 54 ...
Page 66: ...Terminal Management 58 Figure 28 Connecting an ASCII Terminal to a Line Unit ...
Page 104: ...Performance Monitoring 96 ...
Page 120: ...Troubleshooting 112 ...
Page 158: ...Screen Menus and Definitions A 36 ...
Page 162: ...Acronyms and Glossary Glossary 4 ...
Page 167: ......
Page 168: ......