1
S10052
G-MOUNT
INTELLIGENT
LINKING
BATTERIES
USER GUIDE
Page 1: ...1 S10052 G MOUNT INTELLIGENT LINKING BATTERIES USER GUIDE...
Page 2: ...td reserves the right to change specifications or product details without notification Changes to product details will be incorporated in the next version of the document PAG updates documents on a re...
Page 3: ...ore using your battery CLICK ON A SECTION PAGE 1 Introduction 4 2 Specification 7 3 Charging 8 4 Discharging 9 5 Storage 10 6 Battery Linking Features 11 7 Run Time Capacity Data 14 8 Battery Outputs...
Page 4: ...u to travel with all the power you need 1 5 The unique PAGlink technology allows up to 10 batteries to be linked for charge or discharge regardless of their rated capacity or their state of charge Bot...
Page 5: ...g which means no more time wasting camera reboots 1 10 Simultaneous discharge from linked batteries means no dead weight on your camera Sharing the current load extends overall battery life to provide...
Page 6: ...such as the number of charge discharge cycles to assist with battery management 1 17 They will automatically detect and adapt to the camera data system that allows Anton Bauer Gold Mount batteries to...
Page 7: ...res 2 built in D Tap outputs 2 6 Removable USB Output Each battery incorporates 1 removable USB Output Unit 5V regulated 2A continuous 3A peak The unit can be removed and replaced with a Hirose 4 pin...
Page 8: ...te of charge They can be partially charged and discharged without suffering any damaging effects They can also be charged when linked to PAGlink Gold Mount batteries Models 9306 PL94 and 9313 PL150 3...
Page 9: ...measured by the battery This cutoff will only operate if the battery capacity is less than 5 eliminating unwanted operation due to high current and low battery temperature 4 4 The batteries incorporat...
Page 10: ...e avoided Batteries can be put into ship mode by viewing the software version Sft on the display menu see page 15 This greatly reduces the rate of self discharge After 14 days of inactivity a Mini PAG...
Page 11: ...lide the battery to the left 6 1 Linking Batteries To link batteries align the gold studs of one battery with the claws on the front of another Slide the battery across until you hear a click and the...
Page 12: ...ines their capacities into one large power source that you can unlink and fly with legally Individual Li Ion batteries that have capacities greater than 160Wh are banned from passenger aircraft The co...
Page 13: ...cted directly to the camera NOTE The rear battery does not discharge into the front battery Batteries are electronically added to or subtracted from the bus bar to deliver the current required The sta...
Page 14: ...han 9hrs 59mins the display will not provide a figure A single button press of the display off or on load shows a percentage figure of available capacity When the batteries are linked this figure stil...
Page 15: ...a percentage of available capacity in the viewfinder LCD of cameras designed to accept this data Different data standards are used by camera and battery manufacturers Mini PAGlink batteries automatic...
Page 16: ...tput unit push the red release slider on the rear of the battery to the left When the unit is protruding from the battery case it can be pulled out easily To fit a different output unit type align the...
Page 17: ...ature is below 0 C Return the battery to the charger when the battery temperature rises above 0 C Software protection inhibits discharging if the battery temperature falls to 20 C or if it rises to 70...
Page 18: ...t flammable materials Do not short circuit the battery Keep the battery away from fires strong sunlight and excessively hot environments Avoid getting the battery wet and do not use it if it has been...
Page 19: ...rt along with an estimate of the cost of repair before any work is undertaken It is PAG s policy to repair its batteries in keeping with the right to repair unless it is uneconomic for the customer to...
Page 20: ...dle East Aspectra B V Spoorhaven 78 2651 AV Berkel en Rodenrijs Netherlands Tel 31 10 5140680 Email info aspectra nl UK RoW PAG Ltd 565 Kingston Road Raynes Park London SW20 8SA UK Tel 44 0 20 8543 31...
Page 21: ...ibuting towards a more sustainable approach to resources The modules that can be trans ferred to your new battery include the battery s output units the display the protection circuit and the front an...
Page 22: ...at a nominal cost In such a case an estimate will be submitted before work is started if requested The foregoing guarantee is in lieu of all other guarantees express or implied including but not limi...
Page 23: ...vary with each state and each operator PAG advises that you contact both prior to travelling Li Ion batteries cannot be transported in the hold unless attached to a camera Spare Li Ion batteries MUST...