Page 4 of 35
MACHINE PREPARATION
1) UNPACKING THE MACHINE
a) Take off the outer
packaging.
b) The machine is fastened to
the pallet with wooden
wedges that block the
wheels. Remove tie down
straps.
c) Using a ramp, pull the
machine off the pallet.
2) BATTERY INSTALLATION
a) Remove the squeegee hose
from the recovery tank.
b) Remove the vacuum cover
by rotating it
counterclockwise.
c) Remove recovery tank by
lifting tank by lift chain at the
back of the tank and the
drain hose at the front of the
tank.
Remove
Remove
Lift Chain
Drain Hose Lift Point
Summary of Contents for Z26BA
Page 17: ...Page 17 of 35 Brush Deck Assembly Drawing 1...
Page 19: ...Page 19 of 35 Main Frame Assembly Drawing 2...
Page 21: ...Page 21 of 35 Squeegee Arm Assembly Drawing 3...
Page 23: ...Page 23 of 35 Squeegee Assembly Drawing 4...
Page 25: ...Page 25 of 35 Solution Tank Assembly Drawing 5...
Page 27: ...Page 27 of 35 Recovery Tank Assembly Drawing 6...
Page 29: ...Page 29 of 35 Vacuum Assembly Drawing 7...
Page 31: ...Page 31 of 35 Switch Box Assembly Drawing 8...