TROUBLESHOOTING
OPERATOR TOP FIVE TROUBLESHOOTING LIST
2. MACHINE RUN TIME HAS DECREASED
If the machine run time has decreased, there are three potential issues that must be checked: The charger may not be plugged in or
working, the wet, lead acid batteries may need watering or the batteries need to be replaced.
First, check the charger by plugging it in.
Off-board charger LEDs
(charger appearance may vary)
On-board charger LEDs
If an on-board charger, check the three LEDs. If none are on, then you likely have a faulty charger and it will need to be replaced.
However, if the lights are on and the red or yellow light is on, then the batteries aren’t fully charged and the charge cycle needs to be
completed. If the green light is on, then the charger is working and the next step is to consider the batteries.
If an off-board charger, check the charge status LED. If it is not lit or blinking, then you likely have a faulty charger and it will need to be
replaced. However, if the light is on and is blinking then the batteries aren’t fully charged and the charge cycle needs to be completed.
Also, check for the fault LED to be lit and if so, review the manual that comes with your off-board charger for fault details.
If the batteries are wet, lead acid batteries, check the water levels in the battery cells. If they require watering, refer to the Battery
Watering segment of this manual.
If the batteries don’t require watering and are over 18 months old, you’ve likely started to reach a point in the battery’s life where their
capacity is starting to decline. If you are able to meet your run time requirements, then you still have some useful life left. However, if
the capacity has reduced the run time to below your requirements, then it is time to replace the batteries. See Changing Batteries
segment of this manual for further instructions on how to replace your batteries.
If none of these factors are present and you are still not getting expected run times, contact your distributor or Pacific Floorcare for
technical support.
1
2
1
2
Summary of Contents for S-SERIES
Page 45: ...45 FRAME ASSEMBLY WITH URETHANE WHEELS...
Page 46: ...46 FRAME ASSEMBLY WITH FOAM FILLED WHEELS...
Page 48: ...48 ON BOARD CHEMICAL INJECTION ASSEMBLY OPTIONAL...
Page 49: ...49 BATTERY ASSEMBLY...
Page 50: ...50 RECOVERY TANK ASSEMBLY...
Page 51: ...51 SQUEEGEE ASSEMBLY S 24...
Page 52: ...SQUEEGEE ASSEMBLY S 28 52...
Page 53: ...SQUEEGEE ASSEMBLY S 32 53...
Page 54: ...54 SQUEEGEE LINKAGE ASSEMBLY...
Page 55: ...55 HEAD LIFT ASSEMBLY...
Page 56: ...56 HEAD ASSEMBLY DRAWING 1 OF 2 S 24...
Page 57: ...57 HEAD ASSEMBLY DRAWING 2 OF 2 S 24...
Page 58: ...58 HEAD ASSEMBLY S 28 DISK...
Page 59: ...59 HEAD ASSEMBLY S 32...
Page 60: ...60 HEAD ASSEMBLY LOWER S 28 ORBITAL...
Page 61: ...61 HEAD ASSEMBLY UPPER S 28 ORBITAL...
Page 62: ...62 CONTROLS ASSEMBLY S 24...
Page 63: ...63 CONTROLS ASSEMBLY S 28 S 32 DISK...
Page 64: ...64 CONTROLS ASSEMBLY S 28 ORBITAL...
Page 65: ...65 CONTROLS ASSEMBLY BATTERYSHIELD CHEMICAL INJECTION SYSTEM OPTIONAL...
Page 66: ...66 ELECTRONICS ASSEMBLY S 24...
Page 67: ...67 ELECTRONICS ASSEMBLY S 28 S 32 DISK...
Page 68: ...68 ELECTRONICS ASSEMBLY S 28 ORBITAL...
Page 69: ...69 ELECTRONICS ASSEMBLY BATTERYSHIELDTM...
Page 70: ...70 CHARGER ASSEMBLY ON BOARD...
Page 71: ...WIRING DIAGRAM S 24 1 amp diode part 7250008...
Page 72: ...WIRING DIAGRAM S 28 S 32 DISK 1 amp diode part 7250008...
Page 73: ...WIRING DIAGRAM S 28 ORBITAL 1 amp diode part 7250008...
Page 74: ...WIRING DIAGRAM BATTERYSHIELD OPTIONAL 74...
Page 75: ...WIRING DIAGRAM ON BOARD CHEMICAL INJECTION SYSTEM OPTIONAL 75...