4
ALT5.CPINSB 180314-24
Maintenance Checks
Check the following parts for damage such as cracks, excessive corrosion, burned out sections
and excessive warping: (See website for descriptions and more detail)
Weekly:
- Firebrick - Visual, for cracking.
- Door Gasket - sagging, placement, damage.
Monthly
- Brick rail tabs and brick rails.
- Air riser tube in the back of the fi rebox.
- Back side of airwash chamber.
- Baffle locking pin.
- Boost tube cover.
When Cleaning the
Chimney System:
- Top baffle board/blanket.
- Baffle.
- Top heat shield and mounting bolt.
- Baffle Gasket.
- Brick Rails.
- Manifold.
- Some warping of the baffle is normal(up to 1/4” or .65cm).
- Replace if the baffle has permanent warping greater than this or has cracking or breakage.
- Please contact your Dealer if you experience any of the damage listed above. Continuing to
operate your stove with broken parts may accelerate damage to other parts and may void your
warranty
Blowers:
- The blowers should be cleaned out a minimum every six months by using a vacumn on the
blower intakes to remove any dust and debris. See “Fan Speed Controller Relocation” section
on page 12, steps 1 & 2, for how to remove the panels and access the blowers.
Summary of Contents for T5
Page 22: ...22 ALT5 CPINSB 180314 24 NOTES...