
SINB.BODY 190112-24 9
Surround Assembly and Installation
1) Lay part A, B and C face down on a fl at, non-marring
surface. Fasten together with 1/4" x 1/2" bolts and nuts
provided through holes at points “D” (Fig. #8 and #10).
2) Lift the surround assembly to the upright position and make
sure the front face is fl at and even at the joints.
3) Assemble the three trim pieces using the enclosed hard-
ware. Slide part F into the back corners of the trim and
tighten screws. Ensure the mitred corners fi t tightly and
evenly (Fig. #9).
4) Slide the assembled trim over the surround from the top
(Fig. #8).
5) Tighten the retaining screws at the bottom of each trim side
(Fig. #9). If not already done, slide the entire insert out of
the fi replace opening about 1” or more to aid in surround
installation.
6) Remove the two screws located at the top of the left and
right panels. Remove front panels and set aside to prevent
damage (Fig. #11).
Part B
Trim
Trim
Retaining
Screw
Part F
Part A
Part C
Part A
Trim
D
D
D
1/4" Nuts
Part C
1/4" x 1/2" Long Bolts
Fig. # 8
Fig. # 9
Fig. #10
Fig. #11
Fig. # 7
Summary of Contents for SUMMIT INSERT SERIES - B
Page 22: ...22 SINB BODY 190112 24 NOTES...