22
When reassembling, take care with the following:
1. Install the Speed Adjustment Valve T140-308 and
tighten Sleeve T140-326 using an 8 mm Hexagon
Wrench. Do not overtighten.
2. Don’t forget to install the Front and Rear Cylinder
Urethane Washers T70-257 and T70-259.
3. Use the T70-436 Set Screws to adjust out any play or loose
ness in the Slide Assembly before tightening the Holder Screws.
5. Unscrew Sleeve T140-326 using an 8 mm Hexagon
Wrench. Then pull out the Speed Adjustment Valve
T140-308.
6. Unscrew Valve Seals T40-010 and pull out. Check all
seals and o-rings for wear, make sure Valve Seals are
flat, and Valve Rod T70-603 is straight.
1. Remove the two (2) Spanner Nuts T70-216 from the
Rear Piston assembly T70-601 and T140-211 and
push the Pistons inside the Cylinder.
2. Remove the eight (8) holder screws with a T40 Torx
wrench. Loosen the eight (8) Set Screws T70-436.
(No need to remove).
3. Pull the Front and Rear Holders away from the Body
while holding the Outer Guide Assemblies to prevent
the Bearings from being lost. Remove the Front Piston
assembly T70-602 and Rear Piston T140-212.
Together, with the two (2) Shock Absorbers T70-407,
they will come out with the Front Holder. The Speed
Adjustment Assembly will come out with the Rear
Holder.
4. Now remove the Front Retaining Plate T140-404.
The Rear Piston can now be removed from the Body.
23
Use Six M8 Screws
8mm Deep Thread
for Tray Mounting
Use Six M8 Bolts
for Mounting
Speed
Adjustment
Knob
3.0”
77mm
5.8”
148mm
12.8”
325mm
2.5”
63.5mm
Typ.
7”
179mm
4.8”
122mm
1.1”
28.5mm
2.0”
50.9mm
Typ.
7.6”
192mm
2.9”
75mm
1/4” NPT
Factory Repair & Rebuild Service
Return the Transporter by UPS
Prepaid
to our repair center.
After teardown and inspection, P/A Industries will notify you
of the recommended cost for spare parts and labor.
MODEL TP-140 SERVICE
Disassembly
Reassembly
MODEL TP-140 DIMENSIONAL DRAWING
Feed Direction