Self-priming Pump

4

eration of the station, its fastening to the base 

should be carried out through rubber washers 

and gaskets.

ATTENTION! 

A prerequisite for the operation 

of the station is the presence of a 1 ”check 

valve at the inlet of the suction line (not in-

cluded in the set).

Connect a suction pipe with a 1 ”check valve 

at the end to the station inlet (7). Connect a 

standpipe to the station outlet (8). The suction 

line is made from an incompressible hose or 

pipe.

ATTENTION! 

The diameter of the hose or 

pipe must exactly match the diameter of the 

pump inlet - 1 inch.

Avoid connections that narrow or widen the 

fl ow area of   the hose or pipe. The installation 

of fi lter elements on the suction line is strictly 

prohibited.

ATTENTION! 

All connections of the suction 

and pressure pipelines must be tight.

Installing a suction line with a length of more 

than 10 meters horizontally is not advisable, 

as this will lead to a decrease in the suc-

tion lift. When installing the suction line, it is 

necessary to ensure a continuous angle of 

inclination from the station to the water intake 

source of at least one degree to the horizon, 

reverse angles on the suction line are not al-

lowed.

Electrical connection

ATTENTION!

  The  electrical  connection 

should only be carried out after all hydrau-

lic  connections  have  been  completed.

The electrical connection must be carried 

out  by  a  qualified  technician. The  station 

should be installed in such a way that easy 

access to the electrical outlet is provided. 

The socket should only be used for powering 

the station, be grounded and connected to 

a high sensitivity (30 mA) differential circuit 

breaker. The installation location of the sock-

et must be protected from splashing water.

ATTENTION! 

It is forbidden to operate the 

station with a damaged electric cable. In case 

of damage to the electrical cable, you must 

contact the service center to replace it.

Commissioning

At the initial start-up, it is necessary to pre-

fill the pump and the suction line with water 

through the fi ller hole (9). To do this, unscrew 

the plug and fi ll with water until water begins 

to flow out of the filler hole without air bub-

bles, then screw the fi ller plug. Before starting 

the station, it is necessary to check the air 

pressure in the accumulator using a car pres-

sure gauge by connecting it to the pneumatic 

valve (6), it should be 0.15 MPa (1.5 atm). If 

necessary, pump air into the accumulator us-

ing a car pump, otherwise the diaphragm may 

rupture.

After opening all water intake taps to remove 

air from the pressure line, connect the station 

to the power grid. The station pump will start 

to deliver water.

Storage and maintenance

Be sure to flush the pump with clean water 

after each use.

Storage

ATTENTION!

  It  is  necessary  to  store  the 

equipment at an ambient temperature of 0 ° C 

to + 40 ° C and a relative humidity of no more 

than 80% in a place inaccessible to children.

Check regularly that all screws are secure. If 

you fi nd a loose screw, tighten it immediately. 

Otherwise, you put yourself at risk of injury.

Store and handle accessories with care.

If it is necessary to change the cord, to avoid 

a hazard, contact an Authorized P.I.T. Power 

Tool Service Center.

Description of product date

The date of manufacture of the product is 

encrypted in the serial number printed on the 

body of the instrument. The fi rst 2 digits indi-

cate the year of manufacture, the next 2 digits 

are the month and the next 2 digits are the 

day.

Recycling

When disposing of a damaged pump, take all 

measures to avoid harm to the environment. 

Do not attempt to dispose of the pump your-

self. It is highly recommended that you con-

tact the dedicated.

Maintenance and cleaning

 

Before any work on the machine itself 

(e. g. maintenance, tool change, etc.) as 

well as during transport and storage, 

remove the battery from the power tool. 

There is danger of injury when unintention-

ally actuating the On / Off  switch.

 

For safe and proper working, always 

keep the machine and ventilation slots 

clean.

When  the  battery  is  no  longer  operative, 

please refer to an authorised after-sales ser-

vice agent for P.I.T. power tools.

Summary of Contents for POG900-P1

Page 1: ......

Page 2: ...Self priming Pump 1 1 4 5 6 2 3 7 9 10 8...

Page 3: ...anted consequenc es For your safety it is strongly recom mended that you operate the equipment on a level surface It is strictly forbidden to use the pump ing equipment for pumping motor fuel cleaning...

Page 4: ...al data Model POG900 P1 Rated voltage 220 V 50 Hz Rated power 900 W Performance 3 0 m h lifting height 50 m Accumulator volume 24 L Suction depth 8 m The weight 17 Kg Contents of delivery Self priming...

Page 5: ...ary to pre fill the pump and the suction line with water through the ller hole 9 To do this unscrew the plug and ll with water until water begins to flow out of the filler hole without air bub bles th...

Page 6: ...xpiration of the warranty period at attempts of opening or repair of the elec tric machine outside the warranty workshop making constructive changes and lubrication of the tool during the warranty per...

Page 7: ...buyer 5 The warranty does not cover replacement accessories accessories and components for example batteries discs blades drill bits borers chucks chains sprockets collet clamps guide rails tension a...

Page 8: ...7...

Page 9: ...8 1 2 3 4 5 6 M POG900 P1 220 50 900 3 0 3 50 24 L 8 17 1 1 P I T 1 2 3 4 5...

Page 10: ...9 6 7 8 9 10 JS 8 0 15 1 5 0 3 3 1 1 7 8 1 10 30 9 6 0 15 1 5...

Page 11: ...10 1 35 2 2 2 1 2 OnePower 12 I 3 4...

Page 12: ...11 3 2 2 5...

Page 13: ...the Warranty Card the boxes shall be lled out by a seller and to a x the seal of the trade organization in the Guarantee Certi cate and the Warranty Card Warranty By this Warranty Certi cate P I T com...

Page 14: ...13 I ___________ _____ ____________________ I I www pittools ru I I I 12 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ________________________ ________________...

Page 15: ..._______________________________ Serial Number___________ Sale Date ____________20__ Place of Seal Filled out by a Seller WARRANTY REPAIR CARD Date of Acceptance for Repair _______20___ Application for...

Page 16: ...0__ ___20__ ________________________________ ___________ ________20__ Place of Seal O O _______20___ ___________________ _____________________________ ________________________ _____________________ __...

Page 17: ......

Reviews: