INSTALLATION INSTRUCTIONS
The slide can be secured using self-tapping
screws or nuts and bolts through the
predrilled holes located along the base frame
depending on the surface that the slide is
being attached to. Use suitably weight rated
mounting hardware only.
It is recommended that the slide is secured
at a minimum of six (6) equally spaced points
across the base frame.
DO NOT attempt to install with the fridge
mounted to the slide, only install fridge once
the slide is secured in position.
1. Place slide in position where it is to be
installed with the release handle facing in
the direction that the slide is to pull out
from.
2. Extend slide slightly by rotating the
release handle in an anti-clockwise
direction until fridge tray is released.
3. Commence installing the fasteners
starting from the rear and moving forward
using the pre drilled holes
4. If the slide is not moving smoothly,
loosen the fasteners slightly. This may
be caused because the screws/bolts/
fasteners will pull the base frame down to
the mounting surface unevenly and cause
the slide runners to angle inwards. This
is particularly the case if the mounting
surface is covered in a carpet material.
5. When all fasteners are in place, slide
installation is complete.
112.5
260
260
260
118
180
180
119
358
112.5
260
258.4
260
536
886
560
300
4-R30
640
427
956
63
190
190
10
35
112.5
260
260
260
118
180
180
119
358
112.5
260
258.4
260
536
886
560
300
4-R30
640
427
956
63
190
190
10
35
DIMENSIONS AND MOUNTING POINTS