V2.00 - Installation Instructions, Specifications and Project Plans are effective 4/21/2016 . This information is updated periodically
and should not be relied upon after 2 years from 4/21/2016 . Please visit OZCOBP.com to get current information.
step 1
Installation Instructions, .75 OWT Thru-Bolt
Timber Fasteners
9
Installation
Drill 3/4" thru hole
1.
Remove HCN cap, HCN & Timber Bolt Screw
2.
Adjust width of Timber Bolt by turning connectors
3.
Insert into thru hole
4.
Reinstall cap, HCN & Timber Bolt Screw
5.
current and subsequent pages will illustrate these steps
mark locations
plate temporarily installed
for installations without
post to beam connector,
proceed to next step
Summary of Contents for 56649
Page 2: ......