Building the Trampoline & Retaining Wall
Installation Time
You will need two people to assemble the trampoline and wall. The time needed is about half an hr.
You will need:
• Cross-head screwdriver or electric drill (for attaching the retaining wall panels).
• Safety goggles and gloves (for attaching the springs).
Frame Assembly - 14ft x 10ft
Lay out the frame as pictured below (11ft x 8ft on next page) with the spring holes facing upwards. Push all
sections together ensuring they’re all fully connected. Note that the long sides of the frame will appear to bow
outwards (this is the design). When the springs are attached, the frame will pull inwards but the frame will
always have a slight outwards bow.
5
Frame Layout - 14ft (4.25m) x 10ft (3m)
6
Frame Assembly - 11ft x 8ft
Middle Section Socket - Socket
Middle Section Plug - Socket
Middle Section Plug - Socket
Middle Section Socket - Socket
Corner Section Right
Corner Section Left
Corner Section Left
Corner Section Right
Middle Section Long Side
Middle Section Long Side
Frame Layout - 11ft (3.35m) x 8ft (2.45m)
Middle Section
Plug - Socket
Middle Section
Socket - Socket
Corner Section
Plug - Socket
Corner Section
Plug - Socket
Corner Section
Plug - Plug
Corner Section
Plug - Plug
Middle Section
Socket - Socket
Middle Section
Plug - Socket
Summary of Contents for Rectangular In-Ground Trampoline
Page 1: ......