Installation
Drill two holes on the wall at least 2m above the floor and 20mm from any corners. Drill the
two holes 385mm apart and ensure the hole is the same diameter as the rawl plug. Insert
the screws and leave 10mm protruding from the wall to hang the heater on
.
Operating Instructions
1.
Plug the heater into a 220-240V AC outlet. The heater will be on standby mode.
2.
Turn the heater on by pressing the “ON/OFF” button on the remote control or control
panel. The heater will enter fan mode and will blow unheated air.
3.
Turn the heater on by pressing the “MODE” button on the remote control or control
panel. This will set the heater at low heat mode.
4.
Press the “MODE” button again to set the heater at high heat mode.
5.
To turn off the heater, press the “ON/OFF” button again. The fan will keep working for
30 seconds to remove excess heat from the heater.
Operating Instructions
If you are missing any of the below parts please contact
Please be aware that you will be referring to this parts list throughout the assembly
process.