Maintenance operations
13
4. Checking turnstile parts
4.1. Clean the load-bearing frame from contamination.
4.2. Check that all cables are securely connected.
4.3. If necessary check and tighten the screw joints of turnstile:
4.4. Check the condition of the toothed belt and its tension (Fig. 11).
4.5. Check the general condition of the rubber plate of stopper unit
(Fig. 11).
Fig. 11
Summary of Contents for Praktika T-01
Page 2: ......
Page 7: ...Maintenance operations 7 Fig 2...
Page 9: ...Maintenance operations 9 Fig 5...
Page 10: ...Praktika T 01 turnstile 10 Fig 6 Fig 7...
Page 11: ...Maintenance operations 11 Fig 8 Fig 9...
Page 15: ...Maintenance operations 15 Fig 13 Fig 14...
Page 16: ...Praktika T 01 turnstile 16 Fig 15 Fig 16...
Page 18: ...Praktika T 01 turnstile 18...
Page 19: ...Maintenance operations 19...