VZR.248100.000 IG
K-14 Swing gate
Installation Guidelines
17
6
COMPREHENSIVE EXAMINATION
6.1 Visual inspection and check of the product readiness for use
6.1.1
Check fastenings of parts and units of the product.
6.1.2
Check fastenings of all cables.
6.1.3
Turn on power supply of the product and carry out check of
operation by making several test cycles.
6.1.4
If any extraneous noise and violations of operation modes are
not found, the product is ready for operation.