background image

STEP 2:
- Insert the Allen bolt (B), Spring washer (C) through through 2 holes in the stabilizer bar and bottom rail of
Guardrail (A) as shown in FIG.3.
- Insert the Allen bolt (B), Spring washer (C) through the hole in the middle of the side rail of Guardrail (A)
as shown FIG.4.
- Tighten all bolts with Allen key (D). Assembly complete. Thanks You!

STEP 2 " ASSEMBLY OF GUARD RAIL"

THIS STEP REQUIRES :

     Stabilizer bar           (1 pc)
A. Guard rail                 (1 pc)

B. Allen bolt 1-3/8" (35 mm) (3 pcs)

C. Spring washer (3 pcs)

4 of 4

10-10596-V-01

A

D

B

C

D

B

C

D. Allen key (1 pc)

FIG. 3

FIG. 4

STEP 2

Reviews: