STEP 5

Compare the reading on the Fiber OWL 4 BOLT display to Table 1 for acceptable power levels.

STEP 6

Once proper operation has been verified, remove the first patch cable from both units and set it aside.

STEP 7

Connect the second patch cable between the Fiber OWL 4 BOLT and the WaveSource, as shown in 

Figure 3.

STEP 8

Compare the reading on the Fiber OWL 4 BOLT display to Table 1 for acceptable power levels.

STEP 9

Once proper operation has been verified, remove the second patch cable from both units and set it 

aside.

STEP 10

Connect a mandrel wrapped patch cable between the Fiber OWL 4 BOLT and the WaveSource as 

shown in Figure 4.

 

STEP 11

Compare the reading on the Fiber OWL 4 BOLT display to Table 1 for acceptable power levels.

STEP 12

Disconnect this cable from both units, and set it aside.  Press 

<DONE>

 to return to the OPERATING 

MODE menu.

RUN LINK WIZARD

STEP 13

From the OPERATING MODE menu, select CERTIFICATION METER.

STEP 14

From the START MENU, press 

<1>LINK WIZARD

.

STEP 15

From the STORED LINKS menu, highlight the stored link name you wish to use and 

press 

<F2>

 to select.

Core Size

62.5/125 µM

50/125 µM

Replace at

-22.00 dBm
-25.00 dBm

Acceptable Power Level

-19.0 to -22.0 dBm
-22.0 to -25.0 dBm

TABLE 1

FIGURE 4

Connection for

Mandrel-Wrapped

Patch Cables

<1>LINK WIZARD

<2>TAKE READINGS

<3>MAIN MENU

START MENU

Fiber Link #2

NEXT

SELECT

Fiber Link #3

Fiber Link #4

STORED LINKS

_____________________

Fiber Link #1

 LIGHT SOURCE CONNECTOR 

PORT NOTES:

– CONNECTOR TYPE MAY VARY
– DO NOT INSERT ANGLED 

PHYSICAL CONTACT (APC) 
CONNECTOR

Summary of Contents for KIT-FO4B-WSMDst

Page 1: ...262 473 0643 Internet OWL INC COM Revision 1 1 25909 Fiber OWL 4 BOLT Series Test Kits Certification Testing Quick Reference Guide For part numbers KIT FO4B WSMDst KIT FO4B WSMDsc Optical Wavelength Laboratories e C s i h o W i c e e h i T n O s p e i t r i c o a t l a r F o i b b e a r L T h e t s g t n E e l q e u v i p a m W e l n a t c i t p O OWL ...

Page 2: ...il by Complete understanding of each of these issues is critical for performing proper fiber optic tests GETTING STARTED Thank you for your purchase of this OWL certification test kit Included in this kit is a Fiber OWL 4 BOLT optical power meter and a WaveSource multimode fiber optic light source This quick reference guide will assist you in setting up your test kit for a standards based certific...

Page 3: ...ed during this procedure These ports may vary depending upon the model of equipment VERIFY PROPER OPERATION OF THE EQUIPMENT STEP 1 Connect the power meter and light source together with one of the patch cables as shown in Figure 3 STEP 2 Power on the light source STEP 3 Power on the Fiber OWL 4 BOLT STEP 4 From the OPERATING MODE menu select SIMPLE METER FIGURE 3 Connection for Straight Patch Cab...

Page 4: ... and set it aside Press DONE to return to the OPERATING MODE menu RUN LINK WIZARD STEP 13 From the OPERATING MODE menu select CERTIFICATION METER STEP 14 From the START MENU press 1 LINK WIZARD STEP 15 From the STORED LINKS menu highlight the stored link name you wish to use and press F2 to select Core Size 62 5 125 µM 50 125 µM Replace at 22 00 dBm 25 00 dBm Acceptable Power Level 19 0 to 22 0 dB...

Page 5: ...ink 1 x x xxxx LINK NAME X XXXXXXXXXXX _____________________ XXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXX X XXX XXX X SHIFT XXXXXXXXXXXXXXXXXXXXX 03 20 08 DATE MM DD YY X _____________________ XXXXXXXXXXXXXXXXXXXXX X X X XXXXX USER DEFINED 1 X X X XXXXX USER DEFINED 2 x XX XXXXXXXX NEXT SELECT X X XXXXXXX ISO IEC 11801 xx X XXXX FIBER STANDARDS _____________________ X X X TIA ...

Page 6: ...een STEP 31 For setting a 1300nm reference repeat steps 27 through 30 except you will press F1 to select 1300nm as shown at right and make sure that the WaveSource is set to 1300nm left hand LED will be After the 1300nm reference is set the REF dBm field will be filled in with a reference value STEP 32 Press F3 to complete the Link Wizard STEP 33 Press F1 to begin taking readings CONTINUE ON NEXT ...

Page 7: ...oint If this is the first fiber in the link you may be prompted to enter a new label STEP 38 Press F3 to save the data point STEP 39 Disconnect the patch cables from the patch panels and move them to the next port in the patch panel then repeat steps 37 through 39 until all fibers in the link have been tested green red Do NOT disconnect the patch cable s from the light source at any time until all...

Reviews: