background image

10400287-002 03/2011

©2010-11 Overland Storage, Inc.

Page 3 of 7

Quick Start Guide

2.

Repeat 

Step 1

 for the 

right

 slide rail assembly.

3.

Verify that the 

rails

 are level and straight.

Continue with 

“Install the Unit in the Rack.”

Round-Holed Rack Installation

Before installing the rails onto an unthreaded round-holed rack, 
the round-hole rail kit adaptors must be installed on the ends of 
the outer rails.

1.

Attach the 

adaptors

 to both ends of the rail:

a.

Position the adaptor stamped “A” at the front of the 

left

 

outer rail

 (end with the graphic label).

NOTE: Make sure the stamp is at the top and the square adaptor 
holes are aligned with the hooks on the outer rail.

b.

Press the 

adaptor

 onto the hooks and slide it 

upwards

 

until it locks (clicks).

NOTE: The rail buttons will snap into the square holes.

c.

Repeat 

Steps a–b

 for the 

left rear

 adaptor (stamped “B”).

2.

Facing the rack, position the 

left rail

 in the rack, aligning 

the adaptor holes with the 

front

 left rack holes being used.

3.

Using the 

screws

 from the kit, secure the 

front

 of the rail to 

the rack.

4.

Slide the 

rear rail segment 

rearward until the 

rear

 

adaptor holes are in line with holes being used.

5.

Using the 

screws

 from the kit, secure the 

rear

 of the rail to 

the rack.

6.

Repeat 

Steps 1–5

 for the 

right rail

.

7.

Verify that the 

rails

 are level and straight.

Continue the installation with 

“Install the Unit in the Rack.”

Install the Unit in the Rack

WARNING:  It is recommended that a mechanical lifter (or at 
least two people) be used during rack installation or removal to 

prevent injury.

AVERTISSEMENT:  pour éviter toute blessure il est recommande 
qu'un monte-charge (ou deux personnes au moins) soit utilisé 

lors de l'installation ou de l'enlèvement du support.

1.

At the front, extend the 

middle

 rail members until they lock 

(click).

2.

Confirm that the ball-bearing 

shuttles

 are at the 

front

.

3.

Using a mechanical lifter or two people, insert the server into 
the rack 

rails

.

Lift the server to its install height and engage the 

inner 

members

 on the server with the middle members 

protruding from the rack, and slide the server into the rack 
until it stops.

A

B

(Front)

(Rear)

Adaptor

“A” Stamp

Bearing Shuttle

Summary of Contents for SnapServer N2000

Page 1: ...itry or static sensitive devices Step 1 Activate Your Warranty It is essential that you activate your warranty Technical and warranty support are not available until it is done 1 Note the product seri...

Page 2: ...member a Facing the chassis position the rail against the right side of the server with the locking tabs going through the holes on the rail b Slide the rail toward the front to lock it This may requi...

Page 3: ...3 Using the screws from the kit secure the front of the rail to the rack 4 Slide the rear rail segment rearward until the rear adaptor holes are in line with holes being used 5 Using the screws from...

Page 4: ...y a column of different rotational speed drives If you are combining drives with different speeds use the figures below to plan where to place the disk drives Install Drives NOTE Do not remove the dis...

Page 5: ...ust be physically connected to the network For load balancing connect them to the same switch on the same subnet with the switch set to auto negotiate For failover connect them to different switches o...

Page 6: ...equires that name resolution services via DNS or an equivalent service be operational 1 Find the server name The default server name is SNAPnnnnnn where nnnnnn is the server number For example the nam...

Page 7: ...Enter an IP address and a subnet mask then click OK 3 In SSM right click the server name and select Launch Web Administration 4 Log into the Web Management Interface In the login dialog box enter admi...

Reviews: