background image

A

.

Bag x1

D

.

Pole x3

F

.

Nails

 

x12

G

.

Wind rope x 5

B

.

Internal tent x1

C

.

External tent x1

 

1.Take out the inner tent and pave it 
flat, find 2 poles of the same length, 
and penetrate into the corresponding 
position.

2. Put the poles into the copper rings 
at the four corners of the tent.

3.Hang the hook on the tent to the 
pole.

1. Pull out the ground nails and 
windproof rope

.

2.Remove the buckle and pull out 
the pole from the copper ring

3. Remove the poles, fold the tent, 
organize the accessories, and put 
them in the packaging bag.

EN

Open

 

steps:

Storage steps:

4. Take out the external tent, find the 
remaining pole, and pass the pole 
through the pole sleeve.

5.Cover the outer tent outside the 
inner tent, put the pole into the 
copper ring of the tent foot.

6. The fixed position of the ground 
nail wind rope.

Reviews: