IMPORTANT
You must read these instructions carefully before you start to assemble
this greenhouse.Please ensure that you find all parts in the carton box in
the correct type and quantity as mentioned in the list illustrated in every
page accordingly.Please carry out the steps in the order set out in these
instructions.Do not tighten the steps in the greenhouse until completing
on the assembly of the poly carbon ate panels.Keep these instructions in
a safe place for future reference.
SAFETY ADVICE
We strongly recommend the use of work gloves during assembly.
Do not attempt to assemble the greenhouse in windy or wet conditions,
Do not touch overhead power cables with the aluminum profiles.
Always wear shoes and safety goggles when working with extruded
aluminum.
Dispose of all plastic bags safety-keep them out of reach of small
children.
The greenhouse must be positioned and fixed on a flat level surface.
Do not lean against or push the greenhouse during construction.
Keep children away from the assemble area.
Do not position your greenhouse in an area exposed to excessive wind.
Do not attempt to assemble this greenhouse if you are tired ,have taken
drugs or alcohol or if you are prone to dizzy spells.
If using a step ladder or power tools ensure that you follow the
manufactures safety advice.
Hot items such as recently used grills, blowtorches etc.must not be
stores in the greenhouse.
Ensure there are no hidden pipes or cables in the ground before inserting
the pegs.
GENERAL ADVICE
This is a multi-part assembly, Allow at least 140 minutes for assembly.
Selecting a site-choose a sunny level position away from overhanging
trees.
If you are fixing your greenhouse directly to a solid concrete foundation
use the pre drilled holes in the metal base supplied.
The component parts should be checked and laid out close at hand.
Keep all small parts(screws etc)in a bowl so they do not get lost.
Note that the door is hinged on the right hand side and therefore opens
tothe right.
Keep roof clear of snow and leaves.
Firstly, make sure a good installation location.
Find a flat ground which is 2 times bigger than the Green house before
installation.
EN
ASSEMBLY PREPARATION
Summary of Contents for 845-421
Page 4: ...PRODUCT SIZE...
Page 5: ...PART L I S T...
Page 6: ...PART L I S T...
Page 7: ...02 01...
Page 8: ...04 03...
Page 9: ...06 05...
Page 10: ...08 07...
Page 11: ...10 09...
Page 12: ...12 11...
Page 13: ...14 13...
Page 14: ...16 15...
Page 15: ...18 17...
Page 16: ...20 19...
Page 17: ...22 21...
Page 19: ...26 25...
Page 20: ...28 27...
Page 21: ...29 D o n e...
Page 22: ......