background image

02

01

put 2 parts 5 connect with the base part 3 by plastic connector 32

put 12 and 13 connect with 3 by screw

Summary of Contents for 845-243V02

Page 1: ...ASSEMBLY INSTRUCTION MANUAL READ AND SAVE THIS INSTRUCTIONS FOR FUTURE USE INbfc012V01_UK 845 243V02 Tools Recommended ...

Page 2: ......

Page 3: ...TY NO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 1 33 2 34 36 37 38 39 40 41 42 43 44 45 46 A B C D E F G H I J K 2 2 1 1 4 2 2 6 1 1 1 1 1 1 1 1 8 2 2 2 1 1 2 1 1 1 1 1 1 1 4 4 2 2 2 4 2 8 56 1 8 4 32 4 4 4 10 9 2 1 2 1 2 2 1 1 2 BOX 1 2 BOX 1 2 ...

Page 4: ...PART L I S T ...

Page 5: ...PART L I S T ...

Page 6: ...PART L I S T ...

Page 7: ...02 01 put 2 parts 5 connect with the base part 3 by plastic connector 32 put 12 and 13 connect with 3 by screw ...

Page 8: ...04 03 slide PC panel G into groove 5 and 12 13 connect 19 with 5 by screw 39 ...

Page 9: ...06 05 Slide sunlight panels H into the grooves of 5 and 12 13 then tighten the screws Connect 8 with 9 by plastic connector 34 then connect 8 9 with 5 by connector 33 1 33 2 ...

Page 10: ...en connect 21 with 12 and 13 then tighten the screws The door Connect 25 and 27 by plastic connector slide one PC panel K into the groove of 27and 28 slide 28 with its groove to connect with K then slide the other K into the groove of 26 28 and 29 ...

Page 11: ...10 09 According to the above step assemble other side of greenhouse stand greenhouse connect 1 2 with front and back by connector 32 ...

Page 12: ...12 11 connect 6 7 with both ends of 5 by plastic connector 33 1 33 2 connect 2 parts 23 by screw 42 ...

Page 13: ...14 13 Connect both ends of 23 with 8 9 10 11 by plastic connector 34 slide the window into the groove of 23 Connect 23 with plastic connector 34 by screw 42 ...

Page 14: ...15 16 Connect 16 17 18 with 6 7 23 by screws but keep the screws loose for later PC panels assembly then connect 18 with 24 ...

Page 15: ... PC panels A the wall B the roof and J the roof into the grooves of 17and 18 then tighten the screws Connect 36 with 31 by screw 40 then connect dewatering profile with6 7 by screw Connect 31 with 6 7 by screw 38 ...

Page 16: ...19 20 Push the plastic cover onto the top plastic connector Put 44 on inside 4 base corner then connect screw 46 and 45 fixed in to the floor ...

Page 17: ...D o n e In the end In order to enhance the fastness of greenhouse adjust the screws ...

Page 18: ......

Reviews: