background image

9.  

Carefully lift and re-position Lower Girder Section around Support Posts with your helper.

Align Girders as per 

Step 4. 

10.  

When correctly leveled and positioned, place 

Lag Bolts with Washers

through Pre-Drilled holes

of Lower Side Girders and tighten with 9/16th wrench.  Complete both Side Girder attachments.

Replace Lower
Girder Section

Side Girder

11.  

Place second Left Side Girder between Support Posts directly on top of Lower Girder and

attach as per Lower Girder.  Attach Front and Rear Girders with 2 - 3” screws per side.  Complete
Right Side Girder to complete as per left side.

2 - 3” screws
per side

Front

Front

Toll Free 1-888-658-1658              www.outdoorlivingtoday.com        [email protected]

Page 6

Summary of Contents for 6X6 Elevated Platform/Sandbox

Page 1: ...e event of a missing or broken piece simply call the Outdoor Living Today Customer Support Line 1 888 658 1658 within 30 days of the delivery of your purchase It is our commitment to you to courier replacement parts free of charge within 10 business days of this notification Replacement parts will not be provided free of charge after the 30 day grace period IMPORTANT Western Red Cedar Lumber and T...

Page 2: ...are and Footings Thank you for purchasing our 6x6 Elevated Platform Sandbox for your 6x6 Little Squirt Playhouse Please take the time to identify all the parts prior to assembly Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 2 Footings and Post Mounts not Included Please Check with Manufacturer for Specifications G Ladder B Lower Side Girders Lag Bolts A Lowe...

Page 3: ...Before you receive your Playhouse clear the construction area Remove all debris roots grass rocks etc Dig holes for Concrete Forms Sonotube Geographic areas vary for depth and diameter of forms so check with building authority first Concrete Forms should be dug on 69 centers for the front and 63 for the sides Confirm front and sides by measuring 93 1 2 diagonally Front S i d e Holes for Concrete F...

Page 4: ... Mount 1 8 Thick Plate 4 Place Post Mount in wet Concrete Form and position as illustrated Side Front Picture illustrates Support Post installed Post is not required on this however 5 Complete positioning of all Post Mounts Measure and confirm that it is level Adjust as required Allow concrete form to set as per manufacturer s recommendations Front Toll Free 1 888 658 1658 www outdoorlivingtoday c...

Page 5: ...tion and attach bottom to Post Mount Use Hardware recommended by Post Mount Manufacturer 8 Complete positioning and attaching all Support Posts to Post Mounts Measure post height and confirm that it is level Adjust as required Confirm level of post height Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 5 ...

Page 6: ...en with 9 16th wrench Complete both Side Girder attachments Replace Lower Girder Section Side Girder 11 Place second Left Side Girder between Support Posts directly on top of Lower Girder and attach as per Lower Girder Attach Front and Rear Girders with 2 3 screws per side Complete Right Side Girder to complete as per left side 2 3 screws per side Front Front Toll Free 1 888 658 1658 www outdoorli...

Page 7: ...r Pre Drilled and with a 3 8 Cleat on inside ends Attach to Support Posts with 4 Lag Bolts Make sure Girder is flush with top and sides of Posts with Cleat to the inside 13 Locate Upper Side Girder 70 long and Pre Drilled and attach with Lag Bolts to Support Posts as per Step 12 Complete all Upper Girders as Per Steps 12 13 Front Cleat Side Girder Front 75 18 Toll Free 1 888 658 1658 www outdoorli...

Page 8: ...ist Frame to inside of Floor Joist and attach with 2 2 1 2 screws per end Complete attachments of both Floor Joists and both Floor Joist Frames 8 1 4 12 1 4 2 1 2 screws IMPORTANT The Little Squirt Elevated Platform is now complete To complete the Floor Section use parts from the Standard Little Squirt Playhouse Assembly Manual with one exception Floor Runners are not required Please use Steps 16 ...

Page 9: ...e Plywood Floor and position flush with outside of rear Floor Joist Frame When in correct position attach with 1 1 4 screws Use screws every 16 IMPORTANT Be careful that no screw tips are exposed after the Floor is attached Visually inspect before proceeding Remove and reposition screws if necessary 20 Locate Deck Boards 12 5 3 8 and 2 4 1 2 wide x 3 4 x 24 long Start by positioning both 4 1 2 wid...

Page 10: ...ck Boards 12 5 3 8 wide between Outside Deck Boards 23 Space Deck Boards so there is approximately an 1 8 gap between boards and attach with 6 1 1 2 Deck Nails per piece Flush to front 1 2 gap To complete Walls Roof and Trim Section refer to Little Squirt Playhouse Assembly Manual without Elevated Platform Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 10 ...

Page 11: ...al 6 Overall Satisfaction Please call write or email us at Outdoor Living Today Partnership P O Box 96 Sumas Washington 98295 Toll Line 1 888 658 1658 Fax 1 604 462 5333 sales outdoorlivingtoday com The materials contained in this Assembly Manual may be downloaded or copied provided that ALL copies retain the copyright and any other proprietary notices contained on the materials No material may be...

Reviews: