Functional Test
Once the mounting, wiring, and other installation steps are completed, proceed to the
Radian Series
Inverter/Charger Operator’s Manual
. The
Operator’s Manual
has steps for system commissioning. These
include powering up and performing a functional test on the inverter system, as well as powering
down and adding new devices to an existing system.
Refer to the
MATE3 Owner’s Manual
for programming instructions and menus.