
- 20 -
Installation steps
Step 1
- Alignment of height-adjustable feet with spirit level.
- Slightly carve off concrete in siphon area, if necessary.
Step 2
- Press the flat seal from above into the drainage outlet, press siphon body [7] from below onto the
drain and fasten tightly with the drainage valve [6] from above.
- Connect the sewage hose to the siphon body [7] and connect with in-house sewage system.
- Insert cleaning bit [5], press the cover [4] on.
Step 3
- The tub is to be aligned with vertical walls in a 90 degree angle by means of a spirit level.
- The joints are to be filled with silicone. Select type of silicone in accordance with construction
material used. Please mind curing times.
Summary of Contents for NDB1142-370425
Page 6: ... 6 4 Chromabdeckung 5 entnehmbarer Reinigungseinsatz 6 Ablaufventil 7 Siphonkörper 4 5 6 7 ...
Page 10: ... 10 Innenansicht Innenansicht Rundkopfschraube M4x14 Schritt 6 Schritt 7 ...
Page 18: ... 18 4 Chrome cover 5 Removable cleaning insert 6 Drainage valve 7 Siphon body 4 5 6 7 ...
Page 22: ... 22 interior view interior view fillister head screw M4x14 Step 6 Step 7 ...
Page 34: ... 34 Vue intérieure Vue intérieure vis à tête ronde M4x14 Étape 6 Étape 7 ...
Page 42: ... 42 4 copertura cromata 5 inserto di pulizia estraibile 6 valvola di scarico 7 sifone 4 5 6 7 ...
Page 46: ... 46 vista interna vista interna viti a testa tonda M4x14 Fase 6 Fase 7 ...
Page 58: ... 58 binnenaanzicht binnenaanzicht schroeven ronde kop M4x14 Stap 6 Stap 7 ...