
Glue the profile material to the lamination bar. Firmly
press the gluing surfaces together.
3.3 Reinforcing
Bar and clamp
INFORMATION: Before reinforcing, roughen the
bar and foot stirrup and clean them using a
degreasing cleaner.
Reinforce the foot stirrup with carbon fibre stockinette,
letting the woven stockinette project approx.
5 cm
bey
ond the foot stirrup.
Depending on the orthosis construction and the patient-
specific requirements, pull 1 to 3 layers of woven stock
inette over the foot stirrup.
Wrap the reinforcement with an unwaxed thread over
the length of the foot stirrup to form fit the carbon
fibres. Do
not
wrap the projecting woven stockinette.
Reinforce the lamination bar and PVC profile material
with woven stockinette and wrap with unwaxed thread.
6
Procedure
17AD100
Summary of Contents for 17AD100 Nexgear Tango
Page 29: ...29 17AD100...
Page 30: ...17AD100 30...