OTOWA OLM-2 Instruction Manual Download Page 2

Record data can be confirmed.

Surge current level and its record time

Instruction manual

Caution

The lightning memory can only be installed on earth wire. Do not install it
on power line.

Indoor use only. Do not use it outdoor.

Do not expose the lightning memory in the environmental conditions such as
rain, direct sunshine, corrosion gas and dust.

Remove the batteries and store the lightning memory when it is not used.

Do not handle the lightning memory with wet hand.

Push the button slowly and carefully. Prevent a mechanical shock or do not drop it.

Do not dismantle or remodel it.

Do not use different batteries except specified batteries.

In the event of lightning surge exceeding the specification, the lightning memory
may fail.

Warning

Do not install the lightning memory or replace the batteries when lightning strikes.

Safety instruction

Indication of record data

Open the 2 lids for batteries on the bottom.

Insert 2 pieces of LR03 (AAA) size batteries

with care of polarity.

After inserting the batteries, LCD shows the

operation menu and then LCD turns off for

measurement mode.

Close the lids and fix them until they click.

Important

It is recommended that the batteries are replaced every 2 years.
After replacing the batteries, the time returns to initial setting.

00/01/01 00:00

Make sure to set the time correctly after replacing the batteries.

Record data will not be lost.

Conduct the operation test by pushing “TEST” button after replacing the batteries.

Please read the instructions before installing the product, as this

instruction manual explains how to use the lightning memory effectively

and safely.

Insert the batteries

Record data indication

Example of record data

Surge level

Indication

Explanation

S

Small

Surge indication more than 100A

L

Large

Surge indication more than 1kA

T

Test

Test operation

Operation test

When pushing “TEST” button for more than 1 second during
LCD turns off (Measurement mode), time, “T”, and the number
of count are shown. The test operation is recorded to internal
memory. Because of this operation, this device can be confirmed
that it is normal.

Test indication

Year Month Day

Hour

Count

Surge level

Minute

1) Installation by screws

Earth wire is passed through the
bottom dent and fix it by M5 or M6
screws. (2 parts, 1.5 to 2N

m

It becomes measurement condition.

2) Installation by cable ties

Earth wire is passed through the
bottom dent and fix it by 2 cable ties.
It becomes measurement condition.

Time setting

Push “TEST” button and “DATA” button at the
same time for more than 1 second. The LCD
changes to the time setting mode.

If these buttons are not pushed for more than 10 second,

LCD turns off and returns to measurement mode.

Set year, month, day, hour, minute in order by pushing
the buttons.

“TIME” button

Increase the number

“TEST” button

Decrease the number

“DATA”button

Set the number and move to next setting

After setting the time(minute) and push “DATA”
button, LCD shows “SET” and time setting is completed.

If “TIME” button is pushed for more than 1 second, LCD
shows the current time for 5 seconds. Check this time
that is correct.

9

Specification

Name

LIGHTNING MEMORY

Type

OLM-2

OLM-2S

Power source

LR03 (AAA) type Alkali battery 2 pieces

(

Recommendation frequency of batteries replacement

2 years)

Applied wire

2.0

22mm

2

IV or KIV wire

Indication current

S

100A±30

% (

8/20μs

L

1kA±30

8/20μs

Max. current

25kA

8/20

μ

s, 10/350

μ

s

Max. number of record

99

It cannot record data above 99

Signal contact

(OLM-2S)

Open collector output
The signal contact becomes “close”(1s) when operating
and testing.
(If the number of record is more than 99, the signal
contact output operates.)
Maximum operating voltage

DC80V

Maximum operating current

50mA

Time accuracy

Monthly difference

±

15 seconds

Applied use

Indoor use only

Applied temperature

Measurement

20

to

50

℃(

No dewing

Indication

0

to

50

℃(

No dewing

■Contact

Handling store or OTOWA

OTOWA ELECTRIC CO., LTD.

https://www.otowadenki.com/
Head Office (Japan)

TEL +81-6-6429-5951

Time setting mode

Time setting completed

Installation

TIME button

8

Delete of record data

1) Delete of record data

Push “TIME” button and “TEST” button at the same time for
more than 1second. LCD shows “00” and all record data are
deleted.

Important

If record data are deleted, these data cannot be restored.

2) Maximum record data

Totally maximum 99 data can be recorded. If total data
becomes 99, more data cannot be recorded. If operation test is
conducted, LCD shows “DATA FULL”.
Even when the recorded data is 99, the signal contact becomes
“close” when operating and testing.

OLM-2S

Delete of record data

Max. record data

Installation by screws

Installation by cable ties

Screw

Cable tie

Earth wire

Earth wire

Battery replacement

00/_ _/_ _
_ _:_ _

18/12/23
13:46SET

18/12/23
13:47:36

Important

Detection current might be worse when
this product is installed in a metal box.

LIGHTNING MEMORY OLM-2

LIGHTNING MEMORY

OLM-2S

(With signal contact output)

!

!

18/12/23
13:48T01

When pushing “DATA” button for more than 1 second,
the number of record data is shown. (Including test
operation)

When pushing “TIME” button or “TEST” button during
the number of record is shown, the newest record data is
shown.

If pushing “TIME” button or “TEST” button every time,
the record data on LCD scrolls in order.

If these buttons are not pushed for more than 10 second,
LCD turns off and returns to measurement mode.

Indication meaning

03

19/01/13
05:43S03

18/12/28
12:34L02

7

Signal contact output

(OLM-2S)

00

- - DATA - -
- - FULL - -

The signal contact becomes “close”(1sec) when operating and testing.
When using the signal contact output, please connect to the monitoring device using
the harness of signal contact output. (cable length: 300mm,wire diameter: 0.36mm)

DC voltage

Recommended SPD

DC12V

SL-GV12J

DC24V

SL-GV24J

DC48V

SL-GV48J

DC80V

LS-T1FS

Important

The signal contact output should be used less than
maximum operating voltage and maximum operating
current.

Take care of the voltage drop when extending the wires

from the harness of signal contact output.

Connect the red wire of harness to + side of DC power
and the white wire of harness to

side.

Please install the SPD for protecting

the monitoring device from induced
lightning on the signal line.

Signal contact terminal

No

G1-325-18-027c

Reviews: