background image

- 15 -

°C

°C

Summary of Contents for Ecoline Geo RI HP

Page 1: ...ource information is included in this manual to link the cylinder with the heat pump This cylinder is manufactured and approved in accordance with EN 12897 2006 This manual gives detailed advice for i...

Page 2: ...2 9 Hot Water Outlet 3 4 BSPF 10 Flexible Hose 202108 11 Flexible Hose for Expansion Vessel Not supplied 12 Sensor Pocket 1 2 13 Elbow Drain Cock 250445 14 Cable Entry 15 Electrical Box 16 Tee Piece 2...

Page 3: ...tundish should be installed away from electrical devices Primary flow return motorised valve heat pump 17 The heat pump primary flow and return connections should be made to the unit The motorised val...

Page 4: ...pleted ensure the lid to the electrical box is replaced correctly and the retaining screw is fitted 4 If still out of operation contact installer Cold or tepid water discharge from tundish The tundish...

Page 5: ...o suit the installation as long as it is fitted in the correct flow direction Check the flow arrows on the side of the body 4 The expansion valve should be either horizontal or pointing downwards If f...

Page 6: ...tted length of 22mm pipework is 9m Each bend or elbow is equivalent to 0 8m of pipework All pipework must have continuous fall and discharge in a safe visible position If any doubt refer to Building R...

Page 7: ...ch immersion heater has a working thermostat adjustable between 40 C 70 C A safety cut out is also incorporated within the thermostat and will operate at 85 C 3 C Should this happen press the reset bu...

Page 8: ...8 Heat pump...

Page 9: ...9 00071259 00071259 Direct units Indirect units Thermostat 80020 Right thermostat 80030 Left thermostat 80020 Immersion heater 71259 Immersion heater 71259 Electrical spare parts...

Page 10: ...as operated 4 Programmer set to central heating or not switched on 5 Cylinder thermal cut out has operated 6 Motorised valve not operating correctly 1 Check Heat Pump operation If fault suspected cons...

Page 11: ...11 Is the heat pump working Is Thermostat wired as per layout for S plan installation...

Page 12: ...blocks of flats the number served should be limited to not more than 6 systems so that any installation discharging can be traced reasonably easily The single common discharge pipe should be at least...

Page 13: ...13 C O L L E C T I V E M A R K TM...

Page 14: ...3 The benchmark certificate is completed at the time of installation 4 The OSO cylinder is serviced and maintained every 12 months and is marked as such in the benchmark logbook provided with the cyl...

Page 15: ...15 C C...

Page 16: ...COMPANY NAME COMPANY NAME COMPANY NAME COMPANY NAME COMPANY NAME COMPANY NAME COMPANY NAME COMPANY NAME COMPANY NAME TEL No TEL No TEL No TEL No TEL No TEL No TEL No TEL No TEL No TEL No COMMENTS COM...

Reviews: