SECTION 6 - GENERAL SPECIFICATIONS & OPERATOR MAINTENANCE
3121664
– JLG Lift –
6-17
6.4
TIRES & WHEELS
Tire Replacement
JLG recommends a replacement tire be the same size, ply and brand
as originally installed on the machine. Please refer to the JLG Parts
Manual for the part number of the approved tires for a particular
machine model. If not using a JLG approved replacement tire, we
recommend that replacement tires have the following characteris-
tics:
• Equal or greater ply/load rating and size of original
• Tire tread contact width equal or greater than original
• Wheel diameter, width, and offset dimensions equal to the
original
• Approved for the application by the tire manufacturer
(including inflation pressure and maximum tire load)
Unless specifically approved by JLG Industries Inc. do not replace a
foam filled or ballast filled tire assembly with a pneumatic tire. When
selecting and installing a replacement tire, ensure that all tires are
inflated to the pressure recommended by JLG. Due to size variations
between tire brands, both tires on the same axle should be the same.
Wheel and Tire Replacement
The rims installed on each product model have been designed for
stability requirements which consist of track width, tire pressure, and
load capacity. Size changes such as rim width, center piece location,
larger or smaller diameter, etc., without written factory recommen-
dations, may result in an unsafe condition regarding stability.
Wheel Installation
It is extremely important to apply and maintain proper wheel
mounting torque.
WHEEL NUTS MUST BE INSTALLED AND MAINTAINED AT THE PROPER TORQUE TO
PREVENT LOOSE WHEELS, BROKEN STUDS, AND POSSIBLE DANGEROUS SEPARATION
OF WHEEL FROM THE AXLE. BE SURE TO USE ONLY THE NUTS MATCHED TO THE CONE
ANGLE OF THE WHEEL.
Tighten the lug nuts to the proper torque to prevent wheels from
coming loose. Use a torque wrench to tighten the fasteners. If you do
not have a torque wrench, tighten the fasteners with a lug wrench,
then immediately have a service garage or dealer tighten the lug
nuts to the proper torque. Over-tightening will result in breaking the
studs or permanently deforming the mounting stud holes in the
wheels. The proper procedure for attaching wheels is as follows:
Summary of Contents for JLG 520AJ
Page 2: ......
Page 26: ...SECTION 1 SAFETY PRECAUTIONS 1 14 JLG Lift 3121664 NOTES ...
Page 60: ...SECTION 3 MACHINE CONTROLS AND INDICATORS 3 22 JLG Lift 3121664 NOTES ...
Page 68: ...SECTION 4 MACHINE OPERATION 4 8 JLG Lift 3121664 Figure 4 3 Grade and Side Slopes ...
Page 75: ...SECTION 4 MACHINE OPERATION 3121664 JLG Lift 4 15 Figure 4 5 Lifting and Tie Down Chart ...
Page 76: ...SECTION 4 MACHINE OPERATION 4 16 JLG Lift 3121664 Figure 4 6 Decal Location Sheet 1 of 6 ...
Page 77: ...SECTION 4 MACHINE OPERATION 3121664 JLG Lift 4 17 Figure 4 7 Decal Location Sheet 2 of 6 ...
Page 78: ...SECTION 4 MACHINE OPERATION 4 18 JLG Lift 3121664 Figure 4 8 Decal Location Sheet 3 of 6 ...
Page 79: ...SECTION 4 MACHINE OPERATION 3121664 JLG Lift 4 19 Figure 4 9 Decal Location Sheet 4 of 6 ...
Page 80: ...SECTION 4 MACHINE OPERATION 4 20 JLG Lift 3121664 Figure 4 10 Decal Location Sheet 5 of 6 ...
Page 81: ...SECTION 4 MACHINE OPERATION 3121664 JLG Lift 4 21 Figure 4 11 Decal Location Sheet 6 of 6 ...
Page 88: ...SECTION 5 EMERGENCY PROCEDURES 5 4 JLG Lift 3121664 NOTES ...
Page 108: ...SECTION 6 GENERAL SPECIFICATIONS OPERATOR MAINTENANCE 6 20 JLG Lift 3121664 NOTES ...
Page 110: ......
Page 111: ......