SECTION 5 - BASIC HYDRAULIC INFORMATION & HYDRAULIC SCHEMATICS
5-48
– JLG Lift –
3121262
FFWR and TFFT Methods
FFWR (FLATS FROM WRENCH RESISTANCE METHOD)
1.
Tighten the swivel nut to the mating fitting until no lat-
eral movement of the swivel nut can be detected; finger
tight condition.
2.
Mark a dot on one of the swivel hex nut flats and
another dot in line on the connecting tube adapter. See
Figure B.1.
3.
Use the double wrench method per Appendix A, turn
the swivel nut to tighten as shown in Figure B.1. The nut
is to be rotated clockwise the number of hex flats as
defined by the applicable Table in Section 5.0.
4.
After the connection has been properly tightened, mark
a straight line across the connecting parts, not covering
the dots, to indicate the connection has been properly
tightened. See Figure 5-13.
TFFT (TURNS FROM FINGER TIGHT METHOD)
1.
Tighten the swivel nut to the mating fitting until no lat-
eral movement of the swivel nut can be detected; finger
tight condition.
2.
Mark a dot on one of the swivel hex nut flats and
another dot in line on the connecting tube adapter.
3.
Use the double wrench method per Appendix A, turn
the swivel nut to tighten. The nut is to be rotated clock-
wise the number of turns as defined by the applicable
Table in Section 5.0.
4.
After the connection has been properly tightened, mark
a straight line across the connecting parts, not covering
the dots, to indicate the connection has been properly
tightened.
Adjustable Stud End Assembly
For Adjustable Stud End Connections; the following assembly
steps are to be performed:
1.
Lubricate the o-ring with a light coat of hydraulic oil.
2.
Position #1 – The o-ring should be located in the groove
adjacent to the face of the back-up washer. The washer
and o-ring should be positioned at the extreme top end
of the groove as shown.
3.
Position #2 – Position the locknut to just touch the back-
up washer as shown. The locknut in this position will
eliminate potential back up washer damage during the
next step.
4.
Position #3 – Install the connector into the straight
thread box port until the metal back-up washer contacts
the face of the port as shown.
5.
Position #4 – Adjust the connector to the proper posi-
tion by turning out (counterclockwise) up to a maxi-
mum of one turn as shown to provide proper alignment
with the mating connector, tube assembly, or hose
assembly.
6.
Position #5 – Using two wrenches, use the backup
wrench to hold the connector in the desired position
and then use the torque wrench to tighten the locknut
to the appropriate torque.
7.
Visually inspect, where possible, the joint to ensure the
o-ring is not pinched or bulging out from under the
washer and that the backup washer is properly seated
flat against the face of the port.
Figure 5-13. FFWR Method
Summary of Contents for JLG 1500SJ
Page 1: ...Service and Maintenance Manual Model 1500SJ P N 3121262 March 7 2016...
Page 2: ......
Page 24: ...xx JLG Lift 3121262 LIST OF TABLES TABLE NO TITLE PAGE NO This page left blank intentionally...
Page 40: ...SECTION 1 SPECIFICATIONS 1 16 JLG Lift 3121262 NOTES...
Page 62: ...SECTION 3 CHASSIS TURNTABLE 3 12 JLG Lift 3121262 Figure 3 11 Axle Loctite Application...
Page 186: ...SECTION 3 CHASSIS TURNTABLE 3 136 JLG Lift 3121262 Figure 3 72 EMR2 Fault Codes Sheet 1 of 5...
Page 187: ...SECTION 3 CHASSIS TURNTABLE 3121262 JLG Lift 3 137 Figure 3 73 EMR2 Fault Codes Sheet 2 of 5...
Page 188: ...SECTION 3 CHASSIS TURNTABLE 3 138 JLG Lift 3121262 Figure 3 74 EMR2 Fault Codes Sheet 3 of 5...
Page 189: ...SECTION 3 CHASSIS TURNTABLE 3121262 JLG Lift 3 139 Figure 3 75 EMR2 Fault Codes Sheet 4 of 5...
Page 190: ...SECTION 3 CHASSIS TURNTABLE 3 140 JLG Lift 3121262 Figure 3 76 EMR2 Fault Codes Sheet 5 of 5...
Page 202: ...SECTION 3 CHASSIS TURNTABLE 3 152 JLG Lift 3121262...
Page 204: ...SECTION 3 CHASSIS TURNTABLE 3 154 JLG Lift 3121262...
Page 206: ...SECTION 3 CHASSIS TURNTABLE 3 156 JLG Lift 3121262...
Page 216: ...SECTION 3 CHASSIS TURNTABLE 3 166 JLG Lift 3121262...
Page 218: ...SECTION 3 CHASSIS TURNTABLE 3 168 JLG Lift 3121262...
Page 220: ...SECTION 3 CHASSIS TURNTABLE 3 170 JLG Lift 3121262...
Page 222: ...SECTION 3 CHASSIS TURNTABLE 3 172 JLG Lift 3121262...
Page 224: ...SECTION 3 CHASSIS TURNTABLE 3 174 JLG Lift 3121262...
Page 240: ...SECTION 3 CHASSIS TURNTABLE 3 190 JLG Lift 3121262...
Page 244: ...SECTION 3 CHASSIS TURNTABLE 3 194 JLG Lift 3121262...
Page 273: ...SECTION 4 BOOM PLATFORM 3121262 JLG Lift 4 25 Figure 4 6 Boom Assembly Sheet 7 of 7...
Page 305: ...SECTION 4 BOOM PLATFORM 3121262 JLG Lift 4 57 Figure 4 14 Jib Assembly Sheet 2 of 3...
Page 318: ...SECTION 4 BOOM PLATFORM 4 70 JLG Lift 3121262 Figure 4 18 Powertrack Hosing Sheet 2 of 3...
Page 319: ...SECTION 4 BOOM PLATFORM 3121262 JLG Lift 4 71 Figure 4 19 Powertrack Hosing Sheet 3 of 3...
Page 332: ...SECTION 4 BOOM PLATFORM 4 84 JLG Lift 3121262 Figure 4 22 Outer Mid Boom Extend Retract Cables...
Page 333: ...SECTION 4 BOOM PLATFORM 3121262 JLG Lift 4 85 Figure 4 23 Fly Boom Extend Retract Cables...
Page 350: ...SECTION 4 BOOM PLATFORM 4 102 JLG Lift 3121262 Figure 4 29 Rotator Counterbalance Valve...
Page 516: ...SECTION 5 BASIC HYDRAULIC INFORMATION HYDRAULIC SCHEMATICS 5 162 JLG Lift 3121262 NOTES...
Page 536: ...SECTION 6 JLG CONTROL SYSTEM 6 20 JLG Lift 3121262 Figure 6 2 Control System Block Diagram...
Page 545: ...SECTION 6 JLG CONTROL SYSTEM 3121262 JLG Lift 6 29 Figure 6 10 Control Module Location...
Page 704: ...SECTION 7 BASIC ELECTRICAL INFORMATION ELECTRICAL SCHEMATICS 7 60 JLG Lift 3121262 NOTES...
Page 705: ......