SECTION 6 - GENERAL SPECIFICATIONS & OPERATOR MAINTENANCE
6-26
– JLG Lift –
3121213
2.
Tighten nuts in the following sequence:
3.
The tightening of the nuts should be done in stages. Fol-
lowing the recommended sequence, tighten nuts per
wheel torque chart.
4.
Wheel nuts should be torqued after first 50 hours of
operation and after each wheel removal. Check torque
every 3 months or 150 hours of operation.
6.5
SUPPLEMENTAL INFORMATION
The following information is provided in accordance with the
requirements of the European Machinery Directive 2006/42/
EC and is only applicable to CE machines.
For electric powered machines, the equivalent continuous A-
Weighted sound pressure level at the work platform is less
than 70dB(A)
For combustion engine powered machines, guaranteed
Sound Power Level (LWA) per European Directive 2000/14/
EC (Noise Emission in the Environment by Equipment for
Use Outdoors) based on test methods in accordance with
Annex III, Part B, Method 1 and 0 of the directive, is 112 dB.
The vibration total value to which the hand-arm system is
subjected does not exceed 2,5 m/s
2
. The highest root mean
square value of weighted acceleration to which the whole
body is subjected does not exceed 0,5 m/s
2
.
Table 6-14. Wheel Torque Chart
TORQUE SEQUENCE
1st Stage
2nd Stage
3rd Stage
70 ft. lbs.
(95 Nm)
170 ft. lbs.
(225 Nm)
300 ft. lbs.
(405 Nm)
Summary of Contents for 150HAX
Page 2: ......
Page 58: ...SECTION 4 MACHINE OPERATION 4 6 JLG Lift 3121213 Figure 4 3 Grade and Sideslope ...
Page 64: ...SECTION 4 MACHINE OPERATION 4 12 JLG Lift 3121213 Figure 4 4 Lifting Diagram ...
Page 65: ...SECTION 4 MACHINE OPERATION 3121213 JLG Lift 4 13 Figure 4 5 Decal Installation Sheet 1 of 2 ...
Page 66: ...SECTION 4 MACHINE OPERATION 4 14 JLG Lift 3121213 Figure 4 6 Decal Installation Sheet 2 of 2 ...
Page 108: ......
Page 109: ......