Use this instruction to install a fixture wireguard in 
the field for the HBHS1 product series.

Components

HBHS1 Series Fixture (ordered separately) 

LED-HBHS-WG02-KIT-SP or LED-HBHS-WG02-

KIT

NOTE: Kit includes: Fixture wireguard, hardware 

(4 self-drilling bolts) (See Fig. A for provided 

hardware)

Tools Required for Installation 

-Cordless Drill with deep well socket 
attachment

 

Step-by-Step Instructions

HBHS1 D1/E1/F1 Fixture Wireguard Field Installation

Instruction Number: P-INT-X-406

1

Unpack components.

2

Place wireguard onto fixture body so it is 

positioned over locations for screws and nuts to 

be installed. (See Fig. 1 and Fig. 2 for wireguard 

placement)

3

Install self-drilling bolts through wire guard into 

the fixture arm bar. (See Fig. 3 and Fig. 4 for 

locations)

4

OPTIONAL: To prevent driver channel from 

being dislodged in an impact, install self 

supplied fasteners at both ends of the fixture 

arm bars to the driver channel. (See Fig. 5 and 

Fig. 6)

5

Proceed to mount fixture per customer selected 

mounting method and complete electrical 

connections to NEC/local code.

A

2

4

5

1

3

WARNING!

 

 

Risk of fire or electric shock. To reduce risk 
of electrical shock, turn off power supply 
before installation or servicing.

1.  Field installers are responsible for recognizing specific site 

requirements and making adjustments to assure a complete, 
functional installation.

2. Make all power connections using UL listed components.

3. Electrical connections must be made by a qualified electrician

   

 and in accordance with NEC and local codes.