2
Made in USA
Installation Instructions
©2017 Orion Energy Systems, Inc. All rights reserved. Orion and Light Years Ahead are trademarks/
service marks of Orion Energy Systems, Inc. Design modification rights reserved.
O ri o n E n e rgy Sy s te m s , I n c .
orionlighting.com
1. 8 0 0 . 6 6 0 . 9 3 4 0
Use this instruction to install a fixture wireguard in
the field for the HBHS1 product series.
Components
1
HBHS1 Series Fixture (ordered separately)
2
LED-HBHS-WG02-KIT-SP or LED-HBHS-WG02-
KIT
NOTE: Kit includes: Fixture wireguard, hardware
(4 self-drilling bolts) (See Fig. A for provided
hardware)
Tools Required for Installation
-Cordless Drill with deep well socket
attachment
Step-by-Step Instructions
HBHS1 D1/E1/F1 Fixture Wireguard Field Installation
Instruction Number: P-INT-X-406
1
Unpack components.
2
Place wireguard onto fixture body so it is
positioned over locations for screws and nuts to
be installed. (See Fig. 1 and Fig. 2 for wireguard
placement)
3
Install self-drilling bolts through wire guard into
the fixture arm bar. (See Fig. 3 and Fig. 4 for
locations)
4
OPTIONAL: To prevent driver channel from
being dislodged in an impact, install self
supplied fasteners at both ends of the fixture
arm bars to the driver channel. (See Fig. 5 and
Fig. 6)
5
Proceed to mount fixture per customer selected
mounting method and complete electrical
connections to NEC/local code.
A
2
4
5
1
3
WARNING!
Risk of fire or electric shock. To reduce risk
of electrical shock, turn off power supply
before installation or servicing.
1. Field installers are responsible for recognizing specific site
requirements and making adjustments to assure a complete,
functional installation.
2. Make all power connections using UL listed components.
3. Electrical connections must be made by a qualified electrician
and in accordance with NEC and local codes.
6